Official FIR rows
Greater Madawaska Tp | 2024
Raw Financial Information Return rows are shown by official FIR schedule. Summary cards appear only when the metric mapping is confidently available.
Revenue
$7.3M
Expenses
$6.9M
Surplus / deficit
$434,248
Accumulated surplus
$17.9M
FINANCIAL INFORMATION RETURN17 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Name | Not listed | slc.02X.L0020.C01.02 | Not mapped | Jennifer Eve |
| Telephone | Not listed | slc.02X.L0022.C01.02 | Not mapped | 613-752-2240 |
| Email (Required) | Not listed | slc.02X.L0028.C01.02 | Not mapped | treasurer@greatermadawaska.com |
| Website address of Municipality | Not listed | slc.02X.L0030.C01.02 | Not mapped | www.greatermadawaska.com |
| Households | Not listed | slc.02X.L0040.C01.01 | $2,944 | |
| Households | Not listed | slc.02X.L0040.C01.02 | Not mapped | MPAC |
| Population | Not listed | slc.02X.L0041.C01.01 | $2,864 | |
| Population | Not listed | slc.02X.L0041.C01.02 | Not mapped | Stats Can |
| Youth Population | Not listed | slc.02X.L0042.C01.01 | $365 | |
| Youth Population | Not listed | slc.02X.L0042.C01.02 | Not mapped | Stats Can |
| Schedule 54:Cashflow - Direct or Indirect Method chosen | Not listed | slc.02X.L0075.C01.02 | Not mapped | INDIRECT |
| Municipal Treasurer | Not listed | slc.02X.L0090.C01.02 | Not mapped | Jennifer Eve |
| Municipal Auditor | Not listed | slc.02X.L0091.C01.02 | Not mapped | Joanne Dion |
| Municipal Audit Firm | Not listed | slc.02X.L0092.C01.02 | Not mapped | Welch LLP |
| Municipal Treasurer Email (Required) | Not listed | slc.02X.L0093.C01.02 | Not mapped | treasurer@greatermadawaska.com |
| Date | Not listed | slc.02X.L0094.C01.02 | Not mapped | 2025-07-07 |
| Municipal Auditor's Email (Required) | Not listed | slc.02X.L0095.C01.02 | Not mapped | jdion@welchllp.com |
CONSOLIDATED STATEMENT OF OPERATIONS: REVENUE32 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Taxation - Own purposes (SLC 26 9199 04 - 72 2899 07) For UT (SLC | Own Purposes Revenue | slc.10X.L0299.C01.01 | $4.3M | |
| Payments-in-lieu of taxation (SLC 26 9599 08) For UT (SLC 28 0299 | Own Purposes Revenue | slc.10X.L0499.C01.01 | $869,375 | |
| Ontario Municipal Partnership Fund (OMPF) | Own Purposes Revenue | slc.10X.L0620.C01.01 | $591,400 | |
| Subtotal | Own Purposes Revenue | slc.10X.L0699.C01.01 | $591,400 | |
| Ontario conditional grants (SLC 12 9910 01) | Own Purposes Revenue | slc.10X.L0810.C01.01 | $153,451 | |
| Ontario grants for tangible capital assets (SLC 12 9910 05) | Own Purposes Revenue | slc.10X.L0815.C01.01 | $109,607 | |
| Canada conditional grants (SLC 12 9910 02) | Own Purposes Revenue | slc.10X.L0820.C01.01 | $14,192 | |
| Canada grants for tangible capital assets (SLC 12 9910 06) | Own Purposes Revenue | slc.10X.L0825.C01.01 | $178,767 | |
| Conditional Grants Subtotal | Own Purposes Revenue | slc.10X.L0899.C01.01 | $456,017 | |
| Revenue from other municipalities (SLC 12 9910 03) | Own Purposes Revenue | slc.10X.L1099.C01.01 | $26,965 | |
| Total user fees and service charges (SLC 12 9910 04) | Own Purposes Revenue | slc.10X.L1299.C01.01 | $377,057 | |
| Licences and permits | Own Purposes Revenue | slc.10X.L1420.C01.01 | $118,999 | |
| Building Permits | Own Purposes Revenue | slc.10X.L1421.C01.01 | $121,326 | |
| Licences, permits, rents, etc. Subtotal | Own Purposes Revenue | slc.10X.L1499.C01.01 | $240,325 | |
| Penalties and interest on taxes | Own Purposes Revenue | slc.10X.L1620.C01.01 | $105,112 | |
| Fines and Penalties Subtotal | Own Purposes Revenue | slc.10X.L1699.C01.01 | $105,112 | |
| Investment income | Own Purposes Revenue | slc.10X.L1805.C01.01 | $60,059 | |
| Gain/loss on sale of land and capital assets | Own Purposes Revenue | slc.10X.L1811.C01.01 | -$5,632 | |
| Deferred revenue earned (Development Charges)(SLC 60 1025 01 + SL | Own Purposes Revenue | slc.10X.L1812.C01.01 | $245,016 | |
| Other | Own Purposes Revenue | slc.10X.L1890.C01.01 | $106,979 | |
| Other | Not listed | slc.10X.L1890.C01.0A | Not mapped | Insurance Claim |
| Other revenue Subtotal | Own Purposes Revenue | slc.10X.L1899.C01.01 | $406,422 | |
| PLUS: Total revenues (SLC 10 9910 01) | Own Purposes Revenue | slc.10X.L2010.C01.01 | $7.3M | |
| LESS: Total expenses (SLC 40 9910 11) | Own Purposes Revenue | slc.10X.L2020.C01.01 | $6.9M | |
| Accum. Surplus (Deficit), Before Remeas. Gains (Losses) - Begin Yr | Own Purposes Revenue | slc.10X.L2060.C01.01 | $17.5M | |
| Restated Accumulated Surplus (Deficit) - Begin Yr | Own Purposes Revenue | slc.10X.L2062.C01.01 | $17.5M | |
| Annual Surplus / (Deficit), Before Remeasurement Gains (Losses) | Own Purposes Revenue | slc.10X.L2099.C01.01 | $434,248 | |
| Canada Community - Building Fund for Capital Expenses | Own Purposes Revenue | slc.10X.L4099.C01.01 | $91,625 | |
| Canada Community - Building Fund Recognized in the Year | Own Purposes Revenue | slc.10X.L4299.C01.01 | $91,625 | |
| Total Revenues | Own Purposes Revenue | slc.10X.L9910.C01.01 | $7.3M | |
| Property Taxation Subtotal | Own Purposes Revenue | slc.10X.L9940.C01.01 | $5.1M | |
| Accum. Surplus (Deficit) Before Remeas. Gains (Losses)-End Yr | Own Purposes Revenue | slc.10X.L9950.C01.01 | $17.9M |
GRANTS, USER FEES AND SERVICE CHARGES43 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| General government | Canada Conditional Grants | slc.12X.L0299.C01.02 | $2,182 | |
| General government | User Fees and Service Charges | slc.12X.L0299.C01.04 | $2,432 | |
| Fire | Ontario Conditional Grants | slc.12X.L0410.C01.01 | $40,715 | |
| Fire | Other Municipalities | slc.12X.L0410.C01.03 | $11,299 | |
| Building permit and inspection services | User Fees and Service Charges | slc.12X.L0445.C01.04 | $27,152 | |
| Protection Services | Ontario Conditional Grants | slc.12X.L0499.C01.01 | $40,715 | |
| Protection Services | Other Municipalities | slc.12X.L0499.C01.03 | $11,299 | |
| Protection Services | User Fees and Service Charges | slc.12X.L0499.C01.04 | $27,152 | |
| Roads - paved | Canada Conditional Grants | slc.12X.L0611.C01.02 | $4,637 | |
| Roads - paved | Other Municipalities | slc.12X.L0611.C01.03 | $4,643 | |
| Roads - paved | User Fees and Service Charges | slc.12X.L0611.C01.04 | $119,465 | |
| Roads - paved | Ontario Grants - Tangible Capital Assets | slc.12X.L0611.C01.05 | $109,607 | |
| Roads - paved | Canada Grants - Tangible Capital Assets | slc.12X.L0611.C01.06 | $178,767 | |
| Transportation Services | Canada Conditional Grants | slc.12X.L0699.C01.02 | $4,637 | |
| Transportation Services | Other Municipalities | slc.12X.L0699.C01.03 | $4,643 | |
| Transportation Services | User Fees and Service Charges | slc.12X.L0699.C01.04 | $119,465 | |
| Transportation Services | Ontario Grants - Tangible Capital Assets | slc.12X.L0699.C01.05 | $109,607 | |
| Transportation Services | Canada Grants - Tangible Capital Assets | slc.12X.L0699.C01.06 | $178,767 | |
| Solid waste disposal | Other Municipalities | slc.12X.L0850.C01.03 | $11,011 | |
| Solid waste disposal | User Fees and Service Charges | slc.12X.L0850.C01.04 | $53,280 | |
| Waste diversion | Ontario Conditional Grants | slc.12X.L0860.C01.01 | $99,919 | |
| Waste diversion | User Fees and Service Charges | slc.12X.L0860.C01.04 | $23,372 | |
| Environmental Services | Ontario Conditional Grants | slc.12X.L0899.C01.01 | $99,919 | |
| Environmental Services | Other Municipalities | slc.12X.L0899.C01.03 | $11,011 | |
| Environmental Services | User Fees and Service Charges | slc.12X.L0899.C01.04 | $76,652 | |
| Recreation programs | Canada Conditional Grants | slc.12X.L1620.C01.02 | $7,373 | |
| Recreation programs | User Fees and Service Charges | slc.12X.L1620.C01.04 | $27,616 | |
| Recreation facilities - Other | User Fees and Service Charges | slc.12X.L1634.C01.04 | $80,932 | |
| Libraries | Ontario Conditional Grants | slc.12X.L1640.C01.01 | $12,817 | |
| Libraries | Other Municipalities | slc.12X.L1640.C01.03 | $12 | |
| Libraries | User Fees and Service Charges | slc.12X.L1640.C01.04 | $12,108 | |
| Recreation and Cultural Services | Ontario Conditional Grants | slc.12X.L1699.C01.01 | $12,817 | |
| Recreation and Cultural Services | Canada Conditional Grants | slc.12X.L1699.C01.02 | $7,373 | |
| Recreation and Cultural Services | Other Municipalities | slc.12X.L1699.C01.03 | $12 | |
| Recreation and Cultural Services | User Fees and Service Charges | slc.12X.L1699.C01.04 | $120,656 | |
| Planning and zoning | User Fees and Service Charges | slc.12X.L1810.C01.04 | $30,700 | |
| Planning and Development | User Fees and Service Charges | slc.12X.L1899.C01.04 | $30,700 | |
| Total | Ontario Conditional Grants | slc.12X.L9910.C01.01 | $153,451 | |
| Total | Canada Conditional Grants | slc.12X.L9910.C01.02 | $14,192 | |
| Total | Other Municipalities | slc.12X.L9910.C01.03 | $26,965 | |
| Total | User Fees and Service Charges | slc.12X.L9910.C01.04 | $377,057 | |
| Total | Ontario Grants - Tangible Capital Assets | slc.12X.L9910.C01.05 | $109,607 | |
| Total | Canada Grants - Tangible Capital Assets | slc.12X.L9910.C01.06 | $178,767 |
TAXATION INFORMATION51 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| N New Multi-Residential | Not listed | slc.20X.L0202.C01.02 | Not mapped | Y |
| G Parking Lot (Includes CJ,CR,CX,CY,CZ) | Not listed | slc.20X.L0205.C01.02 | Not mapped | N |
| D Office Building | Not listed | slc.20X.L0210.C01.02 | Not mapped | N |
| S Shopping Centre | Not listed | slc.20X.L0215.C01.02 | Not mapped | N |
| L Large Industrial | Not listed | slc.20X.L0220.C01.02 | Not mapped | Y |
| Other | Not listed | slc.20X.L0225.C01.02 | Not mapped | N |
| M Multi-Residential | Exit capping immediately | slc.20X.L0320.C02.01 | Not mapped | Y |
| C Commercial | Exit capping immediately | slc.20X.L0330.C02.01 | Not mapped | Y |
| I Industrial | Exit capping immediately | slc.20X.L0340.C02.01 | Not mapped | Y |
| C Commercial | Grad. Tax Rates in Effect? | slc.20X.L0610.C03.02 | Not mapped | N |
| G Parking Lot | Grad. Tax Rates in Effect? | slc.20X.L0611.C03.02 | Not mapped | N |
| D Office Building | Grad. Tax Rates in Effect? | slc.20X.L0612.C03.02 | Not mapped | N |
| S Shopping Centre | Grad. Tax Rates in Effect? | slc.20X.L0613.C03.02 | Not mapped | N |
| I Industrial | Grad. Tax Rates in Effect? | slc.20X.L0620.C03.02 | Not mapped | N |
| L Large Industrial | Grad. Tax Rates in Effect? | slc.20X.L0621.C03.02 | Not mapped | N |
| R Residential | Phase-In Program in Effect? | slc.20X.L0805.C04.02 | Not mapped | N |
| M Multi-Residential | Phase-In Program in Effect? | slc.20X.L0810.C04.02 | Not mapped | N |
| N New Multi-Residential | Phase-In Program in Effect? | slc.20X.L0815.C04.02 | Not mapped | N |
| C Commercial (Includes G, D, S) | Phase-In Program in Effect? | slc.20X.L0820.C04.02 | Not mapped | N |
| I Industrial (Includes L) | Phase-In Program in Effect? | slc.20X.L0840.C04.02 | Not mapped | N |
| F Farmland | Phase-In Program in Effect? | slc.20X.L0850.C04.02 | Not mapped | N |
| T Managed Forest | Phase-In Program in Effect? | slc.20X.L0855.C04.02 | Not mapped | N |
| P Pipeline | Phase-In Program in Effect? | slc.20X.L0860.C04.02 | Not mapped | N |
| R Residential | Installments | slc.20X.L1210.C06.02 | $1 | |
| R Residential | First Due Date | slc.20X.L1210.C06.03 | Not mapped | 20240328 |
| R Residential | Installments | slc.20X.L1210.C06.05 | $1 | |
| R Residential | First Due Date | slc.20X.L1210.C06.06 | Not mapped | 20240927 |
| M Multi-Residential | Installments | slc.20X.L1220.C06.02 | $1 | |
| M Multi-Residential | First Due Date | slc.20X.L1220.C06.03 | Not mapped | 20240328 |
| M Multi-Residential | Installments | slc.20X.L1220.C06.05 | $1 | |
| M Multi-Residential | First Due Date | slc.20X.L1220.C06.06 | Not mapped | 20240927 |
| F Farmland | Installments | slc.20X.L1230.C06.02 | $1 | |
| F Farmland | First Due Date | slc.20X.L1230.C06.03 | Not mapped | 20240328 |
| F Farmland | Installments | slc.20X.L1230.C06.05 | $1 | |
| F Farmland | First Due Date | slc.20X.L1230.C06.06 | Not mapped | 20240927 |
| T Managed Forest | Installments | slc.20X.L1240.C06.02 | $1 | |
| T Managed Forest | First Due Date | slc.20X.L1240.C06.03 | Not mapped | 20240328 |
| T Managed Forest | Installments | slc.20X.L1240.C06.05 | $1 | |
| T Managed Forest | First Due Date | slc.20X.L1240.C06.06 | Not mapped | 20240927 |
| C Commercial | Installments | slc.20X.L1250.C06.02 | $1 | |
| C Commercial | First Due Date | slc.20X.L1250.C06.03 | Not mapped | 20240328 |
| C Commercial | Installments | slc.20X.L1250.C06.05 | $1 | |
| C Commercial | First Due Date | slc.20X.L1250.C06.06 | Not mapped | 20240927 |
| I Industrial | Installments | slc.20X.L1260.C06.02 | $1 | |
| I Industrial | First Due Date | slc.20X.L1260.C06.03 | Not mapped | 20240328 |
| I Industrial | Installments | slc.20X.L1260.C06.05 | $1 | |
| I Industrial | First Due Date | slc.20X.L1260.C06.06 | Not mapped | 20240927 |
| P Pipeline | Installments | slc.20X.L1270.C06.02 | $1 | |
| P Pipeline | First Due Date | slc.20X.L1270.C06.03 | Not mapped | 20240328 |
| P Pipeline | Installments | slc.20X.L1270.C06.05 | $1 | |
| P Pipeline | First Due Date | slc.20X.L1270.C06.06 | Not mapped | 20240927 |
MUNICIPAL AND SCHOOL BOARD TAXATION14 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Adjustments for properties, shared as if Payment-In-Lieu (Hydro p | LT / ST | slc.22D.L7010.C01.12 | $6,791 | |
| Adjustments for properties, shared as if Payment-In-Lieu (Hydro p | Education Taxes | slc.22D.L7010.C01.14 | -$6,791 | |
| Total of all supplementary taxes (Supps, Omits, Section 359) | LT / ST | slc.22D.L9799.C01.12 | $45,568 | |
| Total of all supplementary taxes (Supps, Omits, Section 359) | UT | slc.22D.L9799.C01.13 | $39,429 | |
| Total of all supplementary taxes (Supps, Omits, Section 359) | Education Taxes | slc.22D.L9799.C01.14 | $16,569 | |
| Total of all supplementary taxes (Supps, Omits, Section 359) | TOTAL | slc.22D.L9799.C01.15 | $101,566 | |
| Total Levied by Tax Rate | LT / ST | slc.22D.L9910.C01.12 | $4.3M | |
| Total Levied by Tax Rate | UT | slc.22D.L9910.C01.13 | $3.6M | |
| Total Levied by Tax Rate | Education Taxes | slc.22D.L9910.C01.14 | $1.4M | |
| Total Levied by Tax Rate | TOTAL | slc.22D.L9910.C01.15 | $9.3M | |
| Total Levies | LT / ST | slc.22D.L9990.C01.12 | $4.3M | |
| Total Levies | UT | slc.22D.L9990.C01.13 | $3.6M | |
| Total Levies | Education Taxes | slc.22D.L9990.C01.14 | $1.4M | |
| Total Levies | TOTAL | slc.22D.L9990.C01.15 | $9.3M |
PAYMENTS-IN-LIEU OF TAXATION15 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Hydro-electric Power Dams - from Province | LT / ST | slc.24D.L8060.C01.12 | $794,030 | |
| Hydro-electric Power Dams - from Province | TOTAL | slc.24D.L8060.C01.15 | $794,030 | |
| Other | Not listed | slc.24D.L8098.C01.0A | Not mapped | County Forestry |
| Other | LT / ST | slc.24D.L8098.C01.12 | $1,511 | |
| Other | TOTAL | slc.24D.L8098.C01.15 | $1,511 | |
| Other Payments-In-Lieu Amounts | LT / ST | slc.24D.L9892.C01.12 | $795,541 | |
| Other Payments-In-Lieu Amounts | TOTAL | slc.24D.L9892.C01.15 | $795,541 | |
| Total PILS Levied by Tax Rate | LT / ST | slc.24D.L9910.C01.12 | $73,834 | |
| Total PILS Levied by Tax Rate | UT | slc.24D.L9910.C01.13 | $63,087 | |
| Total PILS Levied by Tax Rate | Education PILS | slc.24D.L9910.C01.14 | $13,836 | |
| Total PILS Levied by Tax Rate | TOTAL | slc.24D.L9910.C01.15 | $150,757 | |
| Total PILS Levied | LT / ST | slc.24D.L9990.C01.12 | $869,375 | |
| Total PILS Levied | UT | slc.24D.L9990.C01.13 | $63,087 | |
| Total PILS Levied | Education PILS | slc.24D.L9990.C01.14 | $13,836 | |
| Total PILS Levied | TOTAL | slc.24D.L9990.C01.15 | $946,298 |
TAXATION AND PAYMENTS-IN-LIEU SUMMARY187 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Residential | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0010.C01.02 | $848.7M | |
| Residential | Total Taxes | slc.26A.L0010.C01.03 | $8.9M | |
| Residential | Municipal Taxes LT / ST | slc.26A.L0010.C01.04 | $4.1M | |
| Residential | Municipal Taxes UT | slc.26A.L0010.C01.05 | $3.5M | |
| Residential | Education Taxes | slc.26A.L0010.C01.06 | $1.3M | |
| Residential | ENG - Public | slc.26A.L0010.C01.07 | $1.1M | |
| Residential | FRE - Public | slc.26A.L0010.C01.08 | $5,804 | |
| Residential | ENG - Separate | slc.26A.L0010.C01.09 | $149,886 | |
| Residential | FRE - Separate | slc.26A.L0010.C01.10 | $11,829 | |
| Residential | Taxable Asmt. (CVA) | slc.26A.L0010.C01.16 | $848.7M | |
| Residential | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0010.C01.17 | $848.7M | |
| Residential | Phase-In Taxable Asmt. (CVA) | slc.26A.L0010.C01.18 | $848.7M | |
| Farmland | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0110.C01.02 | $1.6M | |
| Farmland | Total Taxes | slc.26A.L0110.C01.03 | $16,528 | |
| Farmland | Municipal Taxes LT / ST | slc.26A.L0110.C01.04 | $7,611 | |
| Farmland | Municipal Taxes UT | slc.26A.L0110.C01.05 | $6,504 | |
| Farmland | Education Taxes | slc.26A.L0110.C01.06 | $2,413 | |
| Farmland | ENG - Public | slc.26A.L0110.C01.07 | $2,180 | |
| Farmland | ENG - Separate | slc.26A.L0110.C01.09 | $233 | |
| Farmland | Taxable Asmt. (CVA) | slc.26A.L0110.C01.16 | $6.3M | |
| Farmland | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0110.C01.17 | $1.6M | |
| Farmland | Phase-In Taxable Asmt. (CVA) | slc.26A.L0110.C01.18 | $6.3M | |
| Managed forests | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0140.C01.02 | $1.8M | |
| Managed forests | Total Taxes | slc.26A.L0140.C01.03 | $18,495 | |
| Managed forests | Municipal Taxes LT / ST | slc.26A.L0140.C01.04 | $8,517 | |
| Managed forests | Municipal Taxes UT | slc.26A.L0140.C01.05 | $7,278 | |
| Managed forests | Education Taxes | slc.26A.L0140.C01.06 | $2,700 | |
| Managed forests | ENG - Public | slc.26A.L0140.C01.07 | $2,510 | |
| Managed forests | ENG - Separate | slc.26A.L0140.C01.09 | $160 | |
| Managed forests | FRE - Separate | slc.26A.L0140.C01.10 | $30 | |
| Managed forests | Taxable Asmt. (CVA) | slc.26A.L0140.C01.16 | $7.1M | |
| Managed forests | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0140.C01.17 | $1.8M | |
| Managed forests | Phase-In Taxable Asmt. (CVA) | slc.26A.L0140.C01.18 | $7.1M | |
| Commercial | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0210.C01.02 | $22.3M | |
| Commercial | Total Taxes | slc.26A.L0210.C01.03 | $307,392 | |
| Commercial | Municipal Taxes LT / ST | slc.26A.L0210.C01.04 | $107,507 | |
| Commercial | Municipal Taxes UT | slc.26A.L0210.C01.05 | $91,860 | |
| Commercial | Education Taxes | slc.26A.L0210.C01.06 | $108,025 | |
| Commercial | ENG - Public | slc.26A.L0210.C01.07 | $65,372 | |
| Commercial | FRE - Public | slc.26A.L0210.C01.08 | $2,314 | |
| Commercial | ENG - Separate | slc.26A.L0210.C01.09 | $35,174 | |
| Commercial | FRE - Separate | slc.26A.L0210.C01.10 | $5,165 | |
| Commercial | Taxable Asmt. (CVA) | slc.26A.L0210.C01.16 | $12.3M | |
| Commercial | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0210.C01.17 | $22.3M | |
| Commercial | Phase-In Taxable Asmt. (CVA) | slc.26A.L0210.C01.18 | $12.3M | |
| Industrial | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0510.C01.02 | $365,842 | |
| Industrial | Total Taxes | slc.26A.L0510.C01.03 | $4,580 | |
| Industrial | Municipal Taxes LT / ST | slc.26A.L0510.C01.04 | $1,766 | |
| Industrial | Municipal Taxes UT | slc.26A.L0510.C01.05 | $1,509 | |
| Industrial | Education Taxes | slc.26A.L0510.C01.06 | $1,305 | |
| Industrial | ENG - Public | slc.26A.L0510.C01.07 | $790 | |
| Industrial | FRE - Public | slc.26A.L0510.C01.08 | $28 | |
| Industrial | ENG - Separate | slc.26A.L0510.C01.09 | $425 | |
| Industrial | FRE - Separate | slc.26A.L0510.C01.10 | $62 | |
| Industrial | Taxable Asmt. (CVA) | slc.26A.L0510.C01.16 | $148,300 | |
| Industrial | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L0510.C01.17 | $365,842 | |
| Industrial | Phase-In Taxable Asmt. (CVA) | slc.26A.L0510.C01.18 | $148,300 | |
| Residential | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1010.C02.02 | $8.9M | |
| Residential | TOTAL PILS Levied | slc.26A.L1010.C02.03 | $85,593 | |
| Residential | LT / ST | slc.26A.L1010.C02.04 | $42,741 | |
| Residential | UT | slc.26A.L1010.C02.05 | $36,520 | |
| Residential | Education PILS | slc.26A.L1010.C02.06 | $6,332 | |
| Residential | PIL Asmt. (CVA) | slc.26A.L1010.C02.16 | $8.9M | |
| Residential | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1010.C02.17 | $8.9M | |
| Residential | Phase-In PIL Asmt. (CVA) | slc.26A.L1010.C02.18 | $8.9M | |
| Commercial | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1210.C02.02 | $6.4M | |
| Commercial | TOTAL PILS Levied | slc.26A.L1210.C02.03 | $64,567 | |
| Commercial | LT / ST | slc.26A.L1210.C02.04 | $30,925 | |
| Commercial | UT | slc.26A.L1210.C02.05 | $26,424 | |
| Commercial | Education PILS | slc.26A.L1210.C02.06 | $7,218 | |
| Commercial | PIL Asmt. (CVA) | slc.26A.L1210.C02.16 | $3.5M | |
| Commercial | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1210.C02.17 | $6.4M | |
| Commercial | Phase-In PIL Asmt. (CVA) | slc.26A.L1210.C02.18 | $3.5M | |
| Landfilll | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1705.C02.02 | $34,721 | |
| Landfilll | TOTAL PILS Levied | slc.26A.L1705.C02.03 | $597 | |
| Landfilll | LT / ST | slc.26A.L1705.C02.04 | $168 | |
| Landfilll | UT | slc.26A.L1705.C02.05 | $143 | |
| Landfilll | Education PILS | slc.26A.L1705.C02.06 | $286 | |
| Landfilll | PIL Asmt. (CVA) | slc.26A.L1705.C02.16 | $29,200 | |
| Landfilll | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L1705.C02.17 | $34,721 | |
| Landfilll | Phase-In PIL Asmt. (CVA) | slc.26A.L1705.C02.18 | $29,200 | |
| Legislated percentage of education taxes distributed to each scho | Education Taxes | slc.26A.L9010.C01.06 | Not mapped | 100.000% |
| Legislated percentage of education taxes distributed to each scho | ENG - Public | slc.26A.L9010.C01.07 | Not mapped | 60.516% |
| Legislated percentage of education taxes distributed to each scho | FRE - Public | slc.26A.L9010.C01.08 | Not mapped | 2.142% |
| Legislated percentage of education taxes distributed to each scho | ENG - Separate | slc.26A.L9010.C01.09 | Not mapped | 32.561% |
| Legislated percentage of education taxes distributed to each scho | FRE - Separate | slc.26A.L9010.C01.10 | Not mapped | 4.781% |
| Legislated percentage of education taxes distributed to each scho | Other | slc.26A.L9010.C01.11 | Not mapped | 0.000% |
| Residential Subtotal | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9110.C01.02 | $852.0M | |
| Residential Subtotal | Total Taxes | slc.26A.L9110.C01.03 | $8.9M | |
| Residential Subtotal | Municipal Taxes LT / ST | slc.26A.L9110.C01.04 | $4.1M | |
| Residential Subtotal | Municipal Taxes UT | slc.26A.L9110.C01.05 | $3.5M | |
| Residential Subtotal | Education Taxes | slc.26A.L9110.C01.06 | $1.3M | |
| Residential Subtotal | ENG - Public | slc.26A.L9110.C01.07 | $1.1M | |
| Residential Subtotal | FRE - Public | slc.26A.L9110.C01.08 | $5,804 | |
| Residential Subtotal | ENG - Separate | slc.26A.L9110.C01.09 | $150,279 | |
| Residential Subtotal | FRE - Separate | slc.26A.L9110.C01.10 | $11,859 | |
| Residential Subtotal | Taxable Asmt. (CVA) | slc.26A.L9110.C01.16 | $862.0M | |
| Residential Subtotal | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9110.C01.17 | $852.0M | |
| Residential Subtotal | Phase-In Taxable Asmt. (CVA) | slc.26A.L9110.C01.18 | $862.0M | |
| Commercial Subtotal | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9120.C01.02 | $22.3M | |
| Commercial Subtotal | Total Taxes | slc.26A.L9120.C01.03 | $307,392 | |
| Commercial Subtotal | Municipal Taxes LT / ST | slc.26A.L9120.C01.04 | $107,507 | |
| Commercial Subtotal | Municipal Taxes UT | slc.26A.L9120.C01.05 | $91,860 | |
| Commercial Subtotal | Education Taxes | slc.26A.L9120.C01.06 | $108,025 | |
| Commercial Subtotal | ENG - Public | slc.26A.L9120.C01.07 | $65,372 | |
| Commercial Subtotal | FRE - Public | slc.26A.L9120.C01.08 | $2,314 | |
| Commercial Subtotal | ENG - Separate | slc.26A.L9120.C01.09 | $35,174 | |
| Commercial Subtotal | FRE - Separate | slc.26A.L9120.C01.10 | $5,165 | |
| Commercial Subtotal | Taxable Asmt. (CVA) | slc.26A.L9120.C01.16 | $12.3M | |
| Commercial Subtotal | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9120.C01.17 | $22.3M | |
| Commercial Subtotal | Phase-In Taxable Asmt. (CVA) | slc.26A.L9120.C01.18 | $12.3M | |
| Industrial Subtotal | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9130.C01.02 | $365,842 | |
| Industrial Subtotal | Total Taxes | slc.26A.L9130.C01.03 | $4,580 | |
| Industrial Subtotal | Municipal Taxes LT / ST | slc.26A.L9130.C01.04 | $1,766 | |
| Industrial Subtotal | Municipal Taxes UT | slc.26A.L9130.C01.05 | $1,509 | |
| Industrial Subtotal | Education Taxes | slc.26A.L9130.C01.06 | $1,305 | |
| Industrial Subtotal | ENG - Public | slc.26A.L9130.C01.07 | $790 | |
| Industrial Subtotal | FRE - Public | slc.26A.L9130.C01.08 | $28 | |
| Industrial Subtotal | ENG - Separate | slc.26A.L9130.C01.09 | $425 | |
| Industrial Subtotal | FRE - Separate | slc.26A.L9130.C01.10 | $62 | |
| Industrial Subtotal | Taxable Asmt. (CVA) | slc.26A.L9130.C01.16 | $148,300 | |
| Industrial Subtotal | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9130.C01.17 | $365,842 | |
| Industrial Subtotal | Phase-In Taxable Asmt. (CVA) | slc.26A.L9130.C01.18 | $148,300 | |
| Adjustments for shared PIL properties | Municipal Taxes LT / ST | slc.26A.L9160.C01.04 | $6,791 | |
| Adjustments for shared PIL properties | Education Taxes | slc.26A.L9160.C01.06 | -$6,791 | |
| Adjustments for shared PIL properties | ENG - Public | slc.26A.L9160.C01.07 | -$4,110 | |
| Adjustments for shared PIL properties | FRE - Public | slc.26A.L9160.C01.08 | -$146 | |
| Adjustments for shared PIL properties | ENG - Separate | slc.26A.L9160.C01.09 | -$2,211 | |
| Adjustments for shared PIL properties | FRE - Separate | slc.26A.L9160.C01.10 | -$324 | |
| Supplementary Taxes | Total Taxes | slc.26A.L9170.C01.03 | $101,566 | |
| Supplementary Taxes | Municipal Taxes LT / ST | slc.26A.L9170.C01.04 | $45,568 | |
| Supplementary Taxes | Municipal Taxes UT | slc.26A.L9170.C01.05 | $39,429 | |
| Supplementary Taxes | Education Taxes | slc.26A.L9170.C01.06 | $16,569 | |
| Supplementary Taxes | ENG - Public | slc.26A.L9170.C01.07 | $13,497 | |
| Supplementary Taxes | FRE - Public | slc.26A.L9170.C01.08 | $517 | |
| Supplementary Taxes | ENG - Separate | slc.26A.L9170.C01.09 | $2,185 | |
| Supplementary Taxes | FRE - Separate | slc.26A.L9170.C01.10 | $370 | |
| Total Levied by Rate | Total Taxes | slc.26A.L9180.C01.03 | $9.3M | |
| Total Levied by Rate | Municipal Taxes LT / ST | slc.26A.L9180.C01.04 | $4.3M | |
| Total Levied by Rate | Municipal Taxes UT | slc.26A.L9180.C01.05 | $3.6M | |
| Total Levied by Rate | Education Taxes | slc.26A.L9180.C01.06 | $1.4M | |
| Total Levied by Rate | ENG - Public | slc.26A.L9180.C01.07 | $1.2M | |
| Total Levied by Rate | FRE - Public | slc.26A.L9180.C01.08 | $8,517 | |
| Total Levied by Rate | ENG - Separate | slc.26A.L9180.C01.09 | $185,852 | |
| Total Levied by Rate | FRE - Separate | slc.26A.L9180.C01.10 | $17,132 | |
| TOTAL before Adj. | Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9199.C01.02 | $874.7M | |
| TOTAL before Adj. | Total Taxes | slc.26A.L9199.C01.03 | $9.3M | |
| TOTAL before Adj. | Municipal Taxes LT / ST | slc.26A.L9199.C01.04 | $4.3M | |
| TOTAL before Adj. | Municipal Taxes UT | slc.26A.L9199.C01.05 | $3.6M | |
| TOTAL before Adj. | Education Taxes | slc.26A.L9199.C01.06 | $1.4M | |
| TOTAL before Adj. | ENG - Public | slc.26A.L9199.C01.07 | $1.2M | |
| TOTAL before Adj. | FRE - Public | slc.26A.L9199.C01.08 | $8,517 | |
| TOTAL before Adj. | ENG - Separate | slc.26A.L9199.C01.09 | $185,852 | |
| TOTAL before Adj. | FRE - Separate | slc.26A.L9199.C01.10 | $17,132 | |
| TOTAL before Adj. | Taxable Asmt. (CVA) | slc.26A.L9199.C01.16 | $874.5M | |
| TOTAL before Adj. | Phase-In Taxable Asmt. (Wtd & Disc CVA) | slc.26A.L9199.C01.17 | $874.7M | |
| TOTAL before Adj. | Phase-In Taxable Asmt. (CVA) | slc.26A.L9199.C01.18 | $874.5M | |
| Residential Subtotal | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9210.C02.02 | $8.9M | |
| Residential Subtotal | TOTAL PILS Levied | slc.26A.L9210.C02.03 | $85,593 | |
| Residential Subtotal | LT / ST | slc.26A.L9210.C02.04 | $42,741 | |
| Residential Subtotal | UT | slc.26A.L9210.C02.05 | $36,520 | |
| Residential Subtotal | Education PILS | slc.26A.L9210.C02.06 | $6,332 | |
| Residential Subtotal | PIL Asmt. (CVA) | slc.26A.L9210.C02.16 | $8.9M | |
| Residential Subtotal | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9210.C02.17 | $8.9M | |
| Residential Subtotal | Phase-In PIL Asmt. (CVA) | slc.26A.L9210.C02.18 | $8.9M | |
| Commercial Subtotal | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9220.C02.02 | $6.4M | |
| Commercial Subtotal | TOTAL PILS Levied | slc.26A.L9220.C02.03 | $64,567 | |
| Commercial Subtotal | LT / ST | slc.26A.L9220.C02.04 | $30,925 | |
| Commercial Subtotal | UT | slc.26A.L9220.C02.05 | $26,424 | |
| Commercial Subtotal | Education PILS | slc.26A.L9220.C02.06 | $7,218 | |
| Commercial Subtotal | PIL Asmt. (CVA) | slc.26A.L9220.C02.16 | $3.5M | |
| Commercial Subtotal | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9220.C02.17 | $6.4M | |
| Commercial Subtotal | Phase-In PIL Asmt. (CVA) | slc.26A.L9220.C02.18 | $3.5M | |
| Total Levied by Rate | TOTAL PILS Levied | slc.26A.L9280.C02.03 | $150,757 | |
| Total Levied by Rate | LT / ST | slc.26A.L9280.C02.04 | $73,834 | |
| Total Levied by Rate | UT | slc.26A.L9280.C02.05 | $63,087 | |
| Total Levied by Rate | Education PILS | slc.26A.L9280.C02.06 | $13,836 | |
| Other PIL Amounts | TOTAL PILS Levied | slc.26A.L9292.C02.03 | $795,541 | |
| Other PIL Amounts | LT / ST | slc.26A.L9292.C02.04 | $795,541 | |
| TOTAL before Adj. | PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9299.C02.02 | $15.3M | |
| TOTAL before Adj. | TOTAL PILS Levied | slc.26A.L9299.C02.03 | $946,298 | |
| TOTAL before Adj. | LT / ST | slc.26A.L9299.C02.04 | $869,375 | |
| TOTAL before Adj. | UT | slc.26A.L9299.C02.05 | $63,087 | |
| TOTAL before Adj. | Education PILS | slc.26A.L9299.C02.06 | $13,836 | |
| TOTAL before Adj. | PIL Asmt. (CVA) | slc.26A.L9299.C02.16 | $12.4M | |
| TOTAL before Adj. | Phase-In PIL Asmt. (Wtd & Disc CVA) | slc.26A.L9299.C02.17 | $15.3M | |
| TOTAL before Adj. | Phase-In PIL Asmt. (CVA) | slc.26A.L9299.C02.18 | $12.4M |
TAXATION AND PAYMENTS-IN-LIEU SUMMARY33 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Other Mun. Tax Assistance Act PILS | TOTAL PILS Levied | slc.26B.L5220.C01.02 | $150,757 | |
| Other Mun. Tax Assistance Act PILS | LT / ST | slc.26B.L5220.C01.03 | $73,834 | |
| Other Mun. Tax Assistance Act PILS | UT | slc.26B.L5220.C01.04 | $63,087 | |
| Other Mun. Tax Assistance Act PILS | Education | slc.26B.L5220.C01.05 | $13,836 | |
| Other Mun. Tax Assistance Act PILS | TOTAL PIL Entitlement | slc.26B.L5220.C01.07 | $150,757 | |
| Other Mun. Tax Assistance Act PILS | LT / ST | slc.26B.L5220.C01.08 | $73,834 | |
| Other Mun. Tax Assistance Act PILS | UT | slc.26B.L5220.C01.09 | $63,087 | |
| Other Mun. Tax Assistance Act PILS | Education | slc.26B.L5220.C01.10 | $13,836 | |
| Other Mun. Tax Assistance Act PILS | English - Public | slc.26B.L5220.C01.11 | $10,233 | |
| Other Mun. Tax Assistance Act PILS | French - Public | slc.26B.L5220.C01.12 | $212 | |
| Other Mun. Tax Assistance Act PILS | English - Separate | slc.26B.L5220.C01.13 | $3,025 | |
| Other Mun. Tax Assistance Act PILS | French - Separate | slc.26B.L5220.C01.14 | $366 | |
| Hydro-Electric Power Dams | TOTAL PILS Levied | slc.26B.L5236.C01.02 | $794,030 | |
| Hydro-Electric Power Dams | LT / ST | slc.26B.L5236.C01.03 | $794,030 | |
| Hydro-Electric Power Dams | TOTAL PIL Entitlement | slc.26B.L5236.C01.07 | $794,030 | |
| Hydro-Electric Power Dams | LT / ST | slc.26B.L5236.C01.08 | $794,030 | |
| Other | TOTAL PILS Levied | slc.26B.L5240.C01.02 | $1,511 | |
| Other | LT / ST | slc.26B.L5240.C01.03 | $1,511 | |
| Other | TOTAL PIL Entitlement | slc.26B.L5240.C01.07 | $1,511 | |
| Other | LT / ST | slc.26B.L5240.C01.08 | $1,511 | |
| Other | Not listed | slc.26B.L5240.C01.0A | Not mapped | County Forestry |
| Source of PILS Total | TOTAL PILS Levied | slc.26B.L9599.C01.02 | $946,298 | |
| Source of PILS Total | LT / ST | slc.26B.L9599.C01.03 | $869,375 | |
| Source of PILS Total | UT | slc.26B.L9599.C01.04 | $63,087 | |
| Source of PILS Total | Education | slc.26B.L9599.C01.05 | $13,836 | |
| Source of PILS Total | TOTAL PIL Entitlement | slc.26B.L9599.C01.07 | $946,298 | |
| Source of PILS Total | LT / ST | slc.26B.L9599.C01.08 | $869,375 | |
| Source of PILS Total | UT | slc.26B.L9599.C01.09 | $63,087 | |
| Source of PILS Total | Education | slc.26B.L9599.C01.10 | $13,836 | |
| Source of PILS Total | English - Public | slc.26B.L9599.C01.11 | $10,233 | |
| Source of PILS Total | French - Public | slc.26B.L9599.C01.12 | $212 | |
| Source of PILS Total | English - Separate | slc.26B.L9599.C01.13 | $3,025 | |
| Source of PILS Total | French - Separate | slc.26B.L9599.C01.14 | $366 |
CONSOLIDATED STATEMENT OF OPERATIONS: EXPENSES134 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Governance | Salaries, Wages and Employee Benefits | slc.40X.L0240.C01.01 | $112,182 | |
| Governance | Materials | slc.40X.L0240.C01.03 | $20,016 | |
| Governance | Contracted Services | slc.40X.L0240.C01.04 | $25,049 | |
| Governance | Total Expenses Before Adjustments | slc.40X.L0240.C01.07 | $157,247 | |
| Governance | Total Expenses After Adjustments | slc.40X.L0240.C01.11 | $157,247 | |
| Corporate Management | Salaries, Wages and Employee Benefits | slc.40X.L0250.C01.01 | $613,637 | |
| Corporate Management | Interest on Long Term Debt | slc.40X.L0250.C01.02 | $1,102 | |
| Corporate Management | Materials | slc.40X.L0250.C01.03 | $253,502 | |
| Corporate Management | Contracted Services | slc.40X.L0250.C01.04 | $53,488 | |
| Corporate Management | Total Expenses Before Adjustments | slc.40X.L0250.C01.07 | $962,268 | |
| Corporate Management | Total Expenses After Adjustments | slc.40X.L0250.C01.11 | $962,268 | |
| Corporate Management | Amortization | slc.40X.L0250.C01.16 | $40,539 | |
| General government | Salaries, Wages and Employee Benefits | slc.40X.L0299.C01.01 | $725,819 | |
| General government | Interest on Long Term Debt | slc.40X.L0299.C01.02 | $1,102 | |
| General government | Materials | slc.40X.L0299.C01.03 | $273,518 | |
| General government | Contracted Services | slc.40X.L0299.C01.04 | $78,537 | |
| General government | Total Expenses Before Adjustments | slc.40X.L0299.C01.07 | $1.1M | |
| General government | Total Expenses After Adjustments | slc.40X.L0299.C01.11 | $1.1M | |
| General government | Amortization | slc.40X.L0299.C01.16 | $40,539 | |
| Fire | Salaries, Wages and Employee Benefits | slc.40X.L0410.C01.01 | $294,116 | |
| Fire | Interest on Long Term Debt | slc.40X.L0410.C01.02 | $1,007 | |
| Fire | Materials | slc.40X.L0410.C01.03 | $188,325 | |
| Fire | Contracted Services | slc.40X.L0410.C01.04 | $2,273 | |
| Fire | Total Expenses Before Adjustments | slc.40X.L0410.C01.07 | $560,465 | |
| Fire | Total Expenses After Adjustments | slc.40X.L0410.C01.11 | $560,465 | |
| Fire | Amortization | slc.40X.L0410.C01.16 | $74,744 | |
| Police | Contracted Services | slc.40X.L0420.C01.04 | $705,722 | |
| Police | Total Expenses Before Adjustments | slc.40X.L0420.C01.07 | $705,722 | |
| Police | Total Expenses After Adjustments | slc.40X.L0420.C01.11 | $705,722 | |
| Conservation authority | External Transfers | slc.40X.L0430.C01.06 | $1,345 | |
| Conservation authority | Total Expenses Before Adjustments | slc.40X.L0430.C01.07 | $1,345 | |
| Conservation authority | Total Expenses After Adjustments | slc.40X.L0430.C01.11 | $1,345 | |
| Protective inspection and control | Contracted Services | slc.40X.L0440.C01.04 | $42,048 | |
| Protective inspection and control | Total Expenses Before Adjustments | slc.40X.L0440.C01.07 | $42,048 | |
| Protective inspection and control | Total Expenses After Adjustments | slc.40X.L0440.C01.11 | $42,048 | |
| Building permit and inspection services | Salaries, Wages and Employee Benefits | slc.40X.L0445.C01.01 | $122,344 | |
| Building permit and inspection services | Materials | slc.40X.L0445.C01.03 | $15,815 | |
| Building permit and inspection services | Contracted Services | slc.40X.L0445.C01.04 | $873 | |
| Building permit and inspection services | Total Expenses Before Adjustments | slc.40X.L0445.C01.07 | $139,032 | |
| Building permit and inspection services | Total Expenses After Adjustments | slc.40X.L0445.C01.11 | $139,032 | |
| Emergency measures | Materials | slc.40X.L0450.C01.03 | $6,194 | |
| Emergency measures | Total Expenses Before Adjustments | slc.40X.L0450.C01.07 | $6,194 | |
| Emergency measures | Total Expenses After Adjustments | slc.40X.L0450.C01.11 | $6,194 | |
| Protection services | Salaries, Wages and Employee Benefits | slc.40X.L0499.C01.01 | $416,460 | |
| Protection services | Interest on Long Term Debt | slc.40X.L0499.C01.02 | $1,007 | |
| Protection services | Materials | slc.40X.L0499.C01.03 | $210,334 | |
| Protection services | Contracted Services | slc.40X.L0499.C01.04 | $750,916 | |
| Protection services | External Transfers | slc.40X.L0499.C01.06 | $1,345 | |
| Protection services | Total Expenses Before Adjustments | slc.40X.L0499.C01.07 | $1.5M | |
| Protection services | Total Expenses After Adjustments | slc.40X.L0499.C01.11 | $1.5M | |
| Protection services | Amortization | slc.40X.L0499.C01.16 | $74,744 | |
| Roads - paved | Salaries, Wages and Employee Benefits | slc.40X.L0611.C01.01 | $879,517 | |
| Roads - paved | Interest on Long Term Debt | slc.40X.L0611.C01.02 | $129,205 | |
| Roads - paved | Materials | slc.40X.L0611.C01.03 | $623,072 | |
| Roads - paved | Total Expenses Before Adjustments | slc.40X.L0611.C01.07 | $2.6M | |
| Roads - paved | Total Expenses After Adjustments | slc.40X.L0611.C01.11 | $2.6M | |
| Roads - paved | Amortization | slc.40X.L0611.C01.16 | $965,983 | |
| Winter control - except sidewalks,parking lots | Salaries, Wages and Employee Benefits | slc.40X.L0621.C01.01 | $54,775 | |
| Winter control - except sidewalks,parking lots | Materials | slc.40X.L0621.C01.03 | $90,262 | |
| Winter control - except sidewalks,parking lots | Total Expenses Before Adjustments | slc.40X.L0621.C01.07 | $145,037 | |
| Winter control - except sidewalks,parking lots | Total Expenses After Adjustments | slc.40X.L0621.C01.11 | $145,037 | |
| Street lighting | Materials | slc.40X.L0650.C01.03 | $6,321 | |
| Street lighting | Total Expenses Before Adjustments | slc.40X.L0650.C01.07 | $6,321 | |
| Street lighting | Total Expenses After Adjustments | slc.40X.L0650.C01.11 | $6,321 | |
| Transportation services | Salaries, Wages and Employee Benefits | slc.40X.L0699.C01.01 | $934,292 | |
| Transportation services | Interest on Long Term Debt | slc.40X.L0699.C01.02 | $129,205 | |
| Transportation services | Materials | slc.40X.L0699.C01.03 | $719,655 | |
| Transportation services | Total Expenses Before Adjustments | slc.40X.L0699.C01.07 | $2.7M | |
| Transportation services | Total Expenses After Adjustments | slc.40X.L0699.C01.11 | $2.7M | |
| Transportation services | Amortization | slc.40X.L0699.C01.16 | $965,983 | |
| Solid waste disposal | Salaries, Wages and Employee Benefits | slc.40X.L0850.C01.01 | $220,797 | |
| Solid waste disposal | Materials | slc.40X.L0850.C01.03 | $23,544 | |
| Solid waste disposal | Contracted Services | slc.40X.L0850.C01.04 | $116,444 | |
| Solid waste disposal | Total Expenses Before Adjustments | slc.40X.L0850.C01.07 | $474,056 | |
| Solid waste disposal | Total Expenses After Adjustments | slc.40X.L0850.C01.11 | $474,056 | |
| Solid waste disposal | Amortization | slc.40X.L0850.C01.16 | $113,271 | |
| Waste diversion | Contracted Services | slc.40X.L0860.C01.04 | $89,142 | |
| Waste diversion | Total Expenses Before Adjustments | slc.40X.L0860.C01.07 | $89,142 | |
| Waste diversion | Total Expenses After Adjustments | slc.40X.L0860.C01.11 | $89,142 | |
| Environmental services | Salaries, Wages and Employee Benefits | slc.40X.L0899.C01.01 | $220,797 | |
| Environmental services | Materials | slc.40X.L0899.C01.03 | $23,544 | |
| Environmental services | Contracted Services | slc.40X.L0899.C01.04 | $205,586 | |
| Environmental services | Total Expenses Before Adjustments | slc.40X.L0899.C01.07 | $563,198 | |
| Environmental services | Total Expenses After Adjustments | slc.40X.L0899.C01.11 | $563,198 | |
| Environmental services | Amortization | slc.40X.L0899.C01.16 | $113,271 | |
| Public health services | External Transfers | slc.40X.L1010.C01.06 | $32,986 | |
| Public health services | Total Expenses Before Adjustments | slc.40X.L1010.C01.07 | $32,986 | |
| Public health services | Total Expenses After Adjustments | slc.40X.L1010.C01.11 | $32,986 | |
| Health services | External Transfers | slc.40X.L1099.C01.06 | $32,986 | |
| Health services | Total Expenses Before Adjustments | slc.40X.L1099.C01.07 | $32,986 | |
| Health services | Total Expenses After Adjustments | slc.40X.L1099.C01.11 | $32,986 | |
| Parks | Total Expenses Before Adjustments | slc.40X.L1610.C01.07 | $73,398 | |
| Parks | Total Expenses After Adjustments | slc.40X.L1610.C01.11 | $73,398 | |
| Parks | Amortization | slc.40X.L1610.C01.16 | $73,398 | |
| Recreation programs | Materials | slc.40X.L1620.C01.03 | $58,374 | |
| Recreation programs | Total Expenses Before Adjustments | slc.40X.L1620.C01.07 | $58,374 | |
| Recreation programs | Total Expenses After Adjustments | slc.40X.L1620.C01.11 | $58,374 | |
| Recreation facilities - Other | Salaries, Wages and Employee Benefits | slc.40X.L1634.C01.01 | $289,158 | |
| Recreation facilities - Other | Materials | slc.40X.L1634.C01.03 | $163,918 | |
| Recreation facilities - Other | External Transfers | slc.40X.L1634.C01.06 | $9,000 | |
| Recreation facilities - Other | Total Expenses Before Adjustments | slc.40X.L1634.C01.07 | $462,076 | |
| Recreation facilities - Other | Total Expenses After Adjustments | slc.40X.L1634.C01.11 | $462,076 | |
| Libraries | Salaries, Wages and Employee Benefits | slc.40X.L1640.C01.01 | $104,511 | |
| Libraries | Materials | slc.40X.L1640.C01.03 | $55,132 | |
| Libraries | Total Expenses Before Adjustments | slc.40X.L1640.C01.07 | $159,643 | |
| Libraries | Total Expenses After Adjustments | slc.40X.L1640.C01.11 | $159,643 | |
| Recreation and cultural services | Salaries, Wages and Employee Benefits | slc.40X.L1699.C01.01 | $393,669 | |
| Recreation and cultural services | Materials | slc.40X.L1699.C01.03 | $277,424 | |
| Recreation and cultural services | External Transfers | slc.40X.L1699.C01.06 | $9,000 | |
| Recreation and cultural services | Total Expenses Before Adjustments | slc.40X.L1699.C01.07 | $753,491 | |
| Recreation and cultural services | Total Expenses After Adjustments | slc.40X.L1699.C01.11 | $753,491 | |
| Recreation and cultural services | Amortization | slc.40X.L1699.C01.16 | $73,398 | |
| Planning and zoning | Salaries, Wages and Employee Benefits | slc.40X.L1810.C01.01 | $100,574 | |
| Planning and zoning | Materials | slc.40X.L1810.C01.03 | $2,545 | |
| Planning and zoning | Contracted Services | slc.40X.L1810.C01.04 | $57,146 | |
| Planning and zoning | Total Expenses Before Adjustments | slc.40X.L1810.C01.07 | $160,265 | |
| Planning and zoning | Total Expenses After Adjustments | slc.40X.L1810.C01.11 | $160,265 | |
| Commercial and industrial | Salaries, Wages and Employee Benefits | slc.40X.L1820.C01.01 | $73,235 | |
| Commercial and industrial | Materials | slc.40X.L1820.C01.03 | $2,794 | |
| Commercial and industrial | Total Expenses Before Adjustments | slc.40X.L1820.C01.07 | $76,029 | |
| Commercial and industrial | Total Expenses After Adjustments | slc.40X.L1820.C01.11 | $76,029 | |
| Planning and development | Salaries, Wages and Employee Benefits | slc.40X.L1899.C01.01 | $173,809 | |
| Planning and development | Materials | slc.40X.L1899.C01.03 | $5,339 | |
| Planning and development | Contracted Services | slc.40X.L1899.C01.04 | $57,146 | |
| Planning and development | Total Expenses Before Adjustments | slc.40X.L1899.C01.07 | $236,294 | |
| Planning and development | Total Expenses After Adjustments | slc.40X.L1899.C01.11 | $236,294 | |
| Total | Salaries, Wages and Employee Benefits | slc.40X.L9910.C01.01 | $2.9M | |
| Total | Interest on Long Term Debt | slc.40X.L9910.C01.02 | $131,314 | |
| Total | Materials | slc.40X.L9910.C01.03 | $1.5M | |
| Total | Contracted Services | slc.40X.L9910.C01.04 | $1.1M | |
| Total | External Transfers | slc.40X.L9910.C01.06 | $43,331 | |
| Total | Total Expenses Before Adjustments | slc.40X.L9910.C01.07 | $6.9M | |
| Total | Total Expenses After Adjustments | slc.40X.L9910.C01.11 | $6.9M | |
| Total | Amortization | slc.40X.L9910.C01.16 | $1.3M |
ADDITIONAL INFORMATION4 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Salaries and wages | Not listed | slc.42X.L5010.C01.01 | $2.3M | |
| Employee benefits | Not listed | slc.42X.L5020.C01.01 | $578,300 | |
| Total salaries, wages and employee benefits (including capitalize | Not listed | slc.42X.L5098.C01.01 | $2.9M | |
| Total salaries, wages and employee benefits (Not including line 5 | Not listed | slc.42X.L5099.C01.01 | $2.9M |
SCHEDULE OF TANGIBLE CAPITAL ASSETS132 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| General government | 2024 Opening Net Book Value | slc.51A.L0299.C01.01 | $1.2M | |
| General government | 2024 Opening Cost Balance | slc.51A.L0299.C01.02 | $1.8M | |
| General government | 2024 Closing Cost Balance | slc.51A.L0299.C01.06 | $1.8M | |
| General government | 2024 Opening Amortization Balance | slc.51A.L0299.C01.07 | $611,726 | |
| General government | Annual Amortization | slc.51A.L0299.C01.08 | $40,539 | |
| General government | 2024 Closing Amortization Balance | slc.51A.L0299.C01.10 | $652,265 | |
| General government | 2024 Closing Net Book Value | slc.51A.L0299.C01.11 | $1.2M | |
| General government | 2024 Opening Net Book Value | slc.51A.L0299.C99.01 | $1.2M | |
| General government | 2024 Opening Cost Balance | slc.51A.L0299.C99.02 | $1.8M | |
| General government | 2024 Opening Amortization Balance | slc.51A.L0299.C99.07 | $611,726 | |
| Fire | 2024 Opening Net Book Value | slc.51A.L0410.C01.01 | $581,478 | |
| Fire | 2024 Opening Cost Balance | slc.51A.L0410.C01.02 | $1.6M | |
| Fire | Additions and Betterments | slc.51A.L0410.C01.03 | $133,524 | |
| Fire | 2024 Closing Cost Balance | slc.51A.L0410.C01.06 | $1.7M | |
| Fire | 2024 Opening Amortization Balance | slc.51A.L0410.C01.07 | $978,942 | |
| Fire | Annual Amortization | slc.51A.L0410.C01.08 | $74,744 | |
| Fire | 2024 Closing Amortization Balance | slc.51A.L0410.C01.10 | $1.1M | |
| Fire | 2024 Closing Net Book Value | slc.51A.L0410.C01.11 | $640,258 | |
| Fire | 2024 Opening Net Book Value | slc.51A.L0410.C99.01 | $581,478 | |
| Fire | 2024 Opening Cost Balance | slc.51A.L0410.C99.02 | $1.6M | |
| Fire | 2024 Opening Amortization Balance | slc.51A.L0410.C99.07 | $978,942 | |
| Protection services | 2024 Opening Net Book Value | slc.51A.L0499.C01.01 | $581,478 | |
| Protection services | 2024 Opening Cost Balance | slc.51A.L0499.C01.02 | $1.6M | |
| Protection services | Additions and Betterments | slc.51A.L0499.C01.03 | $133,524 | |
| Protection services | 2024 Closing Cost Balance | slc.51A.L0499.C01.06 | $1.7M | |
| Protection services | 2024 Opening Amortization Balance | slc.51A.L0499.C01.07 | $978,942 | |
| Protection services | Annual Amortization | slc.51A.L0499.C01.08 | $74,744 | |
| Protection services | 2024 Closing Amortization Balance | slc.51A.L0499.C01.10 | $1.1M | |
| Protection services | 2024 Closing Net Book Value | slc.51A.L0499.C01.11 | $640,258 | |
| Protection services | 2024 Opening Net Book Value | slc.51A.L0499.C99.01 | $581,478 | |
| Protection services | 2024 Opening Cost Balance | slc.51A.L0499.C99.02 | $1.6M | |
| Protection services | 2024 Opening Amortization Balance | slc.51A.L0499.C99.07 | $978,942 | |
| Roads - paved | 2024 Opening Net Book Value | slc.51A.L0611.C01.01 | $15.1M | |
| Roads - paved | 2024 Opening Cost Balance | slc.51A.L0611.C01.02 | $25.2M | |
| Roads - paved | Additions and Betterments | slc.51A.L0611.C01.03 | $1.5M | |
| Roads - paved | Disposals | slc.51A.L0611.C01.04 | $909,608 | |
| Roads - paved | 2024 Closing Cost Balance | slc.51A.L0611.C01.06 | $25.7M | |
| Roads - paved | 2024 Opening Amortization Balance | slc.51A.L0611.C01.07 | $10.1M | |
| Roads - paved | Annual Amortization | slc.51A.L0611.C01.08 | $965,983 | |
| Roads - paved | Amortization Disposal | slc.51A.L0611.C01.09 | $892,284 | |
| Roads - paved | 2024 Closing Amortization Balance | slc.51A.L0611.C01.10 | $10.2M | |
| Roads - paved | 2024 Closing Net Book Value | slc.51A.L0611.C01.11 | $15.5M | |
| Roads - paved | 2024 Opening Net Book Value | slc.51A.L0611.C99.01 | $15.1M | |
| Roads - paved | 2024 Opening Cost Balance | slc.51A.L0611.C99.02 | $25.2M | |
| Roads - paved | 2024 Opening Amortization Balance | slc.51A.L0611.C99.07 | $10.1M | |
| Roads - unpaved | 2024 Opening Net Book Value | slc.51A.L0612.C01.01 | $584,085 | |
| Roads - unpaved | 2024 Opening Cost Balance | slc.51A.L0612.C01.02 | $1.5M | |
| Roads - unpaved | 2024 Closing Cost Balance | slc.51A.L0612.C01.06 | $1.5M | |
| Roads - unpaved | 2024 Opening Amortization Balance | slc.51A.L0612.C01.07 | $965,288 | |
| Roads - unpaved | 2024 Closing Amortization Balance | slc.51A.L0612.C01.10 | $965,288 | |
| Roads - unpaved | 2024 Closing Net Book Value | slc.51A.L0612.C01.11 | $584,085 | |
| Roads - unpaved | 2024 Opening Net Book Value | slc.51A.L0612.C99.01 | $584,085 | |
| Roads - unpaved | 2024 Opening Cost Balance | slc.51A.L0612.C99.02 | $1.5M | |
| Roads - unpaved | 2024 Opening Amortization Balance | slc.51A.L0612.C99.07 | $965,288 | |
| Transportation services | 2024 Opening Net Book Value | slc.51A.L0699.C01.01 | $15.7M | |
| Transportation services | 2024 Opening Cost Balance | slc.51A.L0699.C01.02 | $26.7M | |
| Transportation services | Additions and Betterments | slc.51A.L0699.C01.03 | $1.5M | |
| Transportation services | Disposals | slc.51A.L0699.C01.04 | $909,608 | |
| Transportation services | 2024 Closing Cost Balance | slc.51A.L0699.C01.06 | $27.2M | |
| Transportation services | 2024 Opening Amortization Balance | slc.51A.L0699.C01.07 | $11.1M | |
| Transportation services | Annual Amortization | slc.51A.L0699.C01.08 | $965,983 | |
| Transportation services | Amortization Disposal | slc.51A.L0699.C01.09 | $892,284 | |
| Transportation services | 2024 Closing Amortization Balance | slc.51A.L0699.C01.10 | $11.1M | |
| Transportation services | 2024 Closing Net Book Value | slc.51A.L0699.C01.11 | $16.1M | |
| Transportation services | 2024 Opening Net Book Value | slc.51A.L0699.C99.01 | $15.7M | |
| Transportation services | 2024 Opening Cost Balance | slc.51A.L0699.C99.02 | $26.7M | |
| Transportation services | 2024 Opening Amortization Balance | slc.51A.L0699.C99.07 | $11.1M | |
| Solid waste disposal | 2024 Opening Net Book Value | slc.51A.L0850.C01.01 | $1.2M | |
| Solid waste disposal | 2024 Opening Cost Balance | slc.51A.L0850.C01.02 | $2.4M | |
| Solid waste disposal | Additions and Betterments | slc.51A.L0850.C01.03 | $24,906 | |
| Solid waste disposal | Disposals | slc.51A.L0850.C01.04 | $8,740 | |
| Solid waste disposal | 2024 Closing Cost Balance | slc.51A.L0850.C01.06 | $2.4M | |
| Solid waste disposal | 2024 Opening Amortization Balance | slc.51A.L0850.C01.07 | $1.2M | |
| Solid waste disposal | Annual Amortization | slc.51A.L0850.C01.08 | $113,271 | |
| Solid waste disposal | Amortization Disposal | slc.51A.L0850.C01.09 | $8,740 | |
| Solid waste disposal | 2024 Closing Amortization Balance | slc.51A.L0850.C01.10 | $1.3M | |
| Solid waste disposal | 2024 Closing Net Book Value | slc.51A.L0850.C01.11 | $1.1M | |
| Solid waste disposal | 2024 Opening Net Book Value | slc.51A.L0850.C99.01 | $1.2M | |
| Solid waste disposal | 2024 Opening Cost Balance | slc.51A.L0850.C99.02 | $2.4M | |
| Solid waste disposal | 2024 Opening Amortization Balance | slc.51A.L0850.C99.07 | $1.2M | |
| Environmental services | 2024 Opening Net Book Value | slc.51A.L0899.C01.01 | $1.2M | |
| Environmental services | 2024 Opening Cost Balance | slc.51A.L0899.C01.02 | $2.4M | |
| Environmental services | Additions and Betterments | slc.51A.L0899.C01.03 | $24,906 | |
| Environmental services | Disposals | slc.51A.L0899.C01.04 | $8,740 | |
| Environmental services | 2024 Closing Cost Balance | slc.51A.L0899.C01.06 | $2.4M | |
| Environmental services | 2024 Opening Amortization Balance | slc.51A.L0899.C01.07 | $1.2M | |
| Environmental services | Annual Amortization | slc.51A.L0899.C01.08 | $113,271 | |
| Environmental services | Amortization Disposal | slc.51A.L0899.C01.09 | $8,740 | |
| Environmental services | 2024 Closing Amortization Balance | slc.51A.L0899.C01.10 | $1.3M | |
| Environmental services | 2024 Closing Net Book Value | slc.51A.L0899.C01.11 | $1.1M | |
| Environmental services | 2024 Opening Net Book Value | slc.51A.L0899.C99.01 | $1.2M | |
| Environmental services | 2024 Opening Cost Balance | slc.51A.L0899.C99.02 | $2.4M | |
| Environmental services | 2024 Opening Amortization Balance | slc.51A.L0899.C99.07 | $1.2M | |
| Parks | 2024 Opening Net Book Value | slc.51A.L1610.C01.01 | $1.6M | |
| Parks | 2024 Opening Cost Balance | slc.51A.L1610.C01.02 | $2.3M | |
| Parks | Additions and Betterments | slc.51A.L1610.C01.03 | $9,610 | |
| Parks | Disposals | slc.51A.L1610.C01.04 | $8,341 | |
| Parks | 2024 Closing Cost Balance | slc.51A.L1610.C01.06 | $2.3M | |
| Parks | 2024 Opening Amortization Balance | slc.51A.L1610.C01.07 | $748,247 | |
| Parks | Annual Amortization | slc.51A.L1610.C01.08 | $73,398 | |
| Parks | Amortization Disposal | slc.51A.L1610.C01.09 | $8,341 | |
| Parks | 2024 Closing Amortization Balance | slc.51A.L1610.C01.10 | $813,304 | |
| Parks | 2024 Closing Net Book Value | slc.51A.L1610.C01.11 | $1.5M | |
| Parks | 2024 Opening Net Book Value | slc.51A.L1610.C99.01 | $1.6M | |
| Parks | 2024 Opening Cost Balance | slc.51A.L1610.C99.02 | $2.3M | |
| Parks | 2024 Opening Amortization Balance | slc.51A.L1610.C99.07 | $748,247 | |
| Recreation and cultural services | 2024 Opening Net Book Value | slc.51A.L1699.C01.01 | $1.6M | |
| Recreation and cultural services | 2024 Opening Cost Balance | slc.51A.L1699.C01.02 | $2.3M | |
| Recreation and cultural services | Additions and Betterments | slc.51A.L1699.C01.03 | $9,610 | |
| Recreation and cultural services | Disposals | slc.51A.L1699.C01.04 | $8,341 | |
| Recreation and cultural services | 2024 Closing Cost Balance | slc.51A.L1699.C01.06 | $2.3M | |
| Recreation and cultural services | 2024 Opening Amortization Balance | slc.51A.L1699.C01.07 | $748,247 | |
| Recreation and cultural services | Annual Amortization | slc.51A.L1699.C01.08 | $73,398 | |
| Recreation and cultural services | Amortization Disposal | slc.51A.L1699.C01.09 | $8,341 | |
| Recreation and cultural services | 2024 Closing Amortization Balance | slc.51A.L1699.C01.10 | $813,304 | |
| Recreation and cultural services | 2024 Closing Net Book Value | slc.51A.L1699.C01.11 | $1.5M | |
| Recreation and cultural services | 2024 Opening Net Book Value | slc.51A.L1699.C99.01 | $1.6M | |
| Recreation and cultural services | 2024 Opening Cost Balance | slc.51A.L1699.C99.02 | $2.3M | |
| Recreation and cultural services | 2024 Opening Amortization Balance | slc.51A.L1699.C99.07 | $748,247 | |
| Total Tangible Capital Assets | 2024 Opening Net Book Value | slc.51A.L9910.C01.01 | $20.2M | |
| Total Tangible Capital Assets | 2024 Opening Cost Balance | slc.51A.L9910.C01.02 | $34.8M | |
| Total Tangible Capital Assets | Additions and Betterments | slc.51A.L9910.C01.03 | $1.6M | |
| Total Tangible Capital Assets | Disposals | slc.51A.L9910.C01.04 | $926,689 | |
| Total Tangible Capital Assets | 2024 Closing Cost Balance | slc.51A.L9910.C01.06 | $35.5M | |
| Total Tangible Capital Assets | 2024 Opening Amortization Balance | slc.51A.L9910.C01.07 | $14.6M | |
| Total Tangible Capital Assets | Annual Amortization | slc.51A.L9910.C01.08 | $1.3M | |
| Total Tangible Capital Assets | Amortization Disposal | slc.51A.L9910.C01.09 | $909,365 | |
| Total Tangible Capital Assets | 2024 Closing Amortization Balance | slc.51A.L9910.C01.10 | $14.9M | |
| Total Tangible Capital Assets | 2024 Closing Net Book Value | slc.51A.L9910.C01.11 | $20.5M | |
| Total Tangible Capital Assets | 2024 Opening Net Book Value | slc.51A.L9910.C99.01 | $20.2M | |
| Total Tangible Capital Assets | 2024 Opening Cost Balance | slc.51A.L9910.C99.02 | $34.8M | |
| Total Tangible Capital Assets | 2024 Opening Amortization Balance | slc.51A.L9910.C99.07 | $14.6M |
SCHEDULE OF TANGIBLE CAPITAL ASSETS37 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Land | 2024 Opening Net Book Value (NBV) | slc.51B.L2005.C01.01 | $597,501 | |
| Land | 2024 Closing Net Book Value (NBV) | slc.51B.L2005.C01.11 | $597,501 | |
| Land | 2024 Opening Net Book Value | slc.51B.L2005.C99.01 | $597,501 | |
| Land improvements | 2024 Opening Net Book Value (NBV) | slc.51B.L2010.C01.01 | $752,813 | |
| Land improvements | 2024 Closing Net Book Value (NBV) | slc.51B.L2010.C01.11 | $698,773 | |
| Land improvements | 2024 Opening Net Book Value | slc.51B.L2010.C99.01 | $752,813 | |
| Buildings | 2024 Opening Net Book Value (NBV) | slc.51B.L2020.C01.01 | $2.7M | |
| Buildings | 2024 Closing Net Book Value (NBV) | slc.51B.L2020.C01.11 | $2.6M | |
| Buildings | 2024 Opening Net Book Value | slc.51B.L2020.C99.01 | $2.7M | |
| Machinery and equipment | 2024 Opening Net Book Value (NBV) | slc.51B.L2030.C01.01 | $1.3M | |
| Machinery and equipment | 2024 Closing Net Book Value (NBV) | slc.51B.L2030.C01.11 | $1.3M | |
| Machinery and equipment | 2024 Opening Net Book Value | slc.51B.L2030.C99.01 | $1.3M | |
| Vehicles | 2024 Opening Net Book Value (NBV) | slc.51B.L2040.C01.01 | $2.8M | |
| Vehicles | 2024 Closing Net Book Value (NBV) | slc.51B.L2040.C01.11 | $2.7M | |
| Vehicles | 2024 Opening Net Book Value | slc.51B.L2040.C99.01 | $2.8M | |
| Total General Capital Assets | 2024 Opening Net Book Value (NBV) | slc.51B.L2099.C01.01 | $8.1M | |
| Total General Capital Assets | 2024 Closing Net Book Value (NBV) | slc.51B.L2099.C01.11 | $7.8M | |
| Total General Capital Assets | 2024 Opening Net Book Value | slc.51B.L2099.C99.01 | $8.1M | |
| Linear assets | 2024 Opening Net Book Value (NBV) | slc.51B.L2250.C01.01 | $12.1M | |
| Linear assets | 2024 Closing Net Book Value (NBV) | slc.51B.L2250.C01.11 | $12.7M | |
| Linear assets | 2024 Opening Net Book Value | slc.51B.L2250.C99.01 | $12.1M | |
| Total Infrastructure Assets | 2024 Opening Net Book Value (NBV) | slc.51B.L2299.C01.01 | $12.1M | |
| Total Infrastructure Assets | 2024 Closing Net Book Value (NBV) | slc.51B.L2299.C01.11 | $12.7M | |
| Total Infrastructure Assets | 2024 Opening Net Book Value | slc.51B.L2299.C99.01 | $12.1M | |
| Construction-in-progress | 2024 Opening Net Book Value (NBV) | slc.51B.L2405.C01.01 | $370,627 | |
| Construction-in-progress | Expenditures in 2024 | slc.51B.L2405.C01.02 | 37,944 | |
| Construction-in-progress | Less Assets Capitalized | slc.51B.L2405.C01.03 | 363,177 | |
| Construction-in-progress | 2024 Closing Net Book Value (NBV) | slc.51B.L2405.C01.11 | $45,394 | |
| Construction-in-progress | 2024 Opening Net Book Value | slc.51B.L2405.C99.01 | $370,627 | |
| Total Tangible Capital Assets | 2024 Opening Net Book Value (NBV) | slc.51B.L9920.C01.01 | $20.2M | |
| Total Tangible Capital Assets | 2024 Closing Net Book Value (NBV) | slc.51B.L9920.C01.11 | $20.5M | |
| Total Tangible Capital Assets | 2024 Opening Net Book Value | slc.51B.L9920.C99.01 | $20.2M | |
| Total Tangible Capital Assets and Construction-in-progress | 2024 Opening Net Book Value (NBV) | slc.51B.L9921.C01.01 | $20.6M | |
| Total Tangible Capital Assets and Construction-in-progress | Expenditures in 2024 | slc.51B.L9921.C01.02 | 37,944 | |
| Total Tangible Capital Assets and Construction-in-progress | Less Assets Capitalized | slc.51B.L9921.C01.03 | 363,177 | |
| Total Tangible Capital Assets and Construction-in-progress | 2024 Closing Net Book Value (NBV) | slc.51B.L9921.C01.11 | $20.6M | |
| Total Tangible Capital Assets and Construction-in-progress | 2024 Opening Net Book Value | slc.51B.L9921.C99.01 | $20.6M |
CONSOLIDATED STATEMENT OF CHANGE IN NET FINANCIAL ASSETS (NET DEB25 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Infrastructure Ontario | Not listed | slc.53X.L0265.C01.01 | $453,485 | |
| Subtotal | Not listed | slc.53X.L0299.C01.01 | $453,485 | |
| Reserves and Reserve funds (SLC 60 1012 02 + SLC 60 1012 03) | Not listed | slc.53X.L0406.C01.01 | $14,794 | |
| Development charges (SLC 61 0299 08) | Not listed | slc.53X.L0415.C01.01 | $245,016 | |
| Capital grants: Federal (SLC 12 9910 06 - SLC 10 4099 01) | Not listed | slc.53X.L0425.C01.01 | $87,142 | |
| Capital grants: Provincial(SLC 12 9910 05 - (SLC 10 4019 01 - SLC | Not listed | slc.53X.L0430.C01.01 | $109,607 | |
| Canada Community - Building Fund - AMO (SLC 10 4099 01) | Not listed | slc.53X.L0440.C01.01 | $91,625 | |
| Subtotal | Not listed | slc.53X.L0499.C01.01 | $548,184 | |
| Subtotal | Not listed | slc.53X.L0501.C01.01 | $259,810 | |
| Subtotal | Not listed | slc.53X.L0502.C01.01 | $288,374 | |
| Unexpended Capital Financing or (Unfinanced Capital Outlay) | Not listed | slc.53X.L0810.C01.01 | -$293,991 | |
| Annual Surplus(Deficit) Before Remeas. Gains(Losses) | Not listed | slc.53X.L1010.C01.01 | $434,248 | |
| Acquisition of tangible capital assets | Not listed | slc.53X.L1020.C01.01 | -$1.6M | |
| Amortization of tangible capital assets (SLC 51 9910 08) | Not listed | slc.53X.L1030.C01.01 | $1.3M | |
| Change in construction-in-progress | Not listed | slc.53X.L1032.C01.01 | $325,233 | |
| Loss/(Gain) on sale to tangible capital assets | Not listed | slc.53X.L1040.C01.01 | $17,323 | |
| Subtotal | Not listed | slc.53X.L1099.C01.01 | -$10,402 | |
| Change in supplies inventories | Not listed | slc.53X.L1210.C01.01 | -$96,867 | |
| Change in prepaid expenses | Not listed | slc.53X.L1220.C01.01 | $5,690 | |
| Subtotal | Not listed | slc.53X.L1299.C01.01 | -$91,177 | |
| Decr/(Incr) in Net Financial Assets/Net Debt | Not listed | slc.53X.L1410.C01.01 | $332,669 | |
| Net financial assets (net debt), beginning of year | Not listed | slc.53X.L1420.C01.01 | -$3.3M | |
| Restated Net Financial Assets (Net Debt), beginning of year | Not listed | slc.53X.L1423.C01.01 | -$3.3M | |
| Net Financial Assets (Net Debt), End of Year | Not listed | slc.53X.L9910.C01.01 | -$3.0M | |
| Total Capital Financing | Not listed | slc.53X.L9920.C01.01 | $1.0M |
CONSOLIDATED STATEMENT OF CASH FLOW (SELECT DIRECT OR INDIRECT ME19 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Cash used to acquire tangible capital assets | Actual | slc.54B.L0620.C01.01 | -$1.3M | |
| Cash applied to capital transactions | Actual | slc.54B.L0699.C01.01 | -$1.3M | |
| Proceeds from debt issues | Actual | slc.54B.L1010.C01.01 | $453,485 | |
| Debt repayment | Actual | slc.54B.L1020.C01.01 | -$501,058 | |
| Cash applied to financing transactions | Actual | slc.54B.L1099.C01.01 | -$47,573 | |
| Increase in cash and cash equivalents | Actual | slc.54B.L1210.C01.01 | $364,475 | |
| Cash and cash equivalents, beginning of year | Actual | slc.54B.L1220.C01.01 | $841,635 | |
| Cash | Actual | slc.54B.L1401.C01.01 | $1.2M | |
| Unrestricted | Actual | slc.54B.L1501.C01.01 | $1.2M | |
| Restricted | Actual | slc.54B.L1502.C01.01 | $25,215 | |
| Annual surplus/(deficit) (SLC 10 2099 01) | Actual | slc.54B.L2010.C01.01 | $434,248 | |
| Non-cash items including amortization | Actual | slc.54B.L2020.C01.01 | $1.3M | |
| Change in non-cash assets and liabilities | Actual | slc.54B.L2022.C01.01 | -$63,608 | |
| Prepaid expenses | Actual | slc.54B.L2030.C01.01 | $5,688 | |
| Change in deferred revenue | Actual | slc.54B.L2040.C01.01 | $63,442 | |
| Cash provided by operating transactions | Actual | slc.54B.L2099.C01.01 | $1.7M | |
| Cash and cash equivalents, end of year | Actual | slc.54B.L9920.C01.01 | $1.2M | |
| Cash and cash equivalents, end of year | Actual | slc.54B.L9940.C01.01 | $1.2M | |
| Cash and cash equivalents, end of year | Actual | slc.54B.L9950.C01.01 | $1.2M |
CONTINUITY OF RESERVES AND RESERVE FUNDS27 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Balance, beginning of year | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0299.C01.01 | $144,146 | |
| Balance, beginning of year | Reserves | slc.60X.L0299.C01.03 | $1.6M | |
| Contributions from Operations | Reserves | slc.60X.L0312.C01.03 | $434,247 | |
| Net Development Charges Collected (SLC 61 0299 06 - SLC 61 0299 03) | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0615.C01.01 | $239,965 | |
| Subtotal Development Charges Act | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0699.C01.01 | $239,965 | |
| Recreational land (the Planning Act) | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0830.C01.01 | $4,023 | |
| Investment income | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0841.C01.01 | $5,051 | |
| Less: Utilization (deferred revenue recognized) | Obligatory Res. Funds, Deferred Rev. | slc.60X.L0910.C01.01 | $245,016 | |
| Less: Utilization (deferred revenue recognized) | Reserves | slc.60X.L0910.C01.03 | $107,038 | |
| For acquisition of tangible capital asset | Reserves | slc.60X.L1012.C01.03 | $14,794 | |
| For current operations | Reserves | slc.60X.L1015.C01.03 | $92,244 | |
| Development Charges earned to tangible capital asset acquisition | Obligatory Res. Funds, Deferred Rev. | slc.60X.L1025.C01.01 | $245,016 | |
| Balance, end of year | Obligatory Res. Funds, Deferred Rev. | slc.60X.L2099.C01.01 | $148,169 | |
| Balance, end of year | Reserves | slc.60X.L2099.C01.03 | $1.9M | |
| Working funds | Reserves | slc.60X.L5010.C01.03 | $353,723 | |
| Transportation services : Roadways | Reserves | slc.60X.L5215.C01.03 | $1.3M | |
| Environmental services : Solid waste collection | Reserves | slc.60X.L5240.C01.03 | $340,000 | |
| Recreation and cultural services : Parks | Reserves | slc.60X.L5265.C01.03 | $16,240 | |
| Recreation and cultural services : Recreation facilities - Other | Reserves | slc.60X.L5274.C01.03 | $46,362 | |
| Lot levies | Reserves | slc.60X.L5630.C01.03 | -$87,222 | |
| Recreational land (the Planning Act) | Obligatory Res. Funds, Deferred Rev. | slc.60X.L5650.C01.01 | $143,889 | |
| Other | Obligatory Res. Funds, Deferred Rev. | slc.60X.L5695.C01.01 | $4,280 | |
| Other | Not listed | slc.60X.L5695.C01.0A | Not mapped | Shoreline |
| Total | Obligatory Res. Funds, Deferred Rev. | slc.60X.L9930.C01.01 | $148,169 | |
| Total | Reserves | slc.60X.L9930.C01.03 | $1.9M | |
| TOTAL Revenues & Surplus | Obligatory Res. Funds, Deferred Rev. | slc.60X.L9940.C01.01 | $249,039 | |
| TOTAL Revenues & Surplus | Reserves | slc.60X.L9940.C01.03 | $434,247 |
DEVELOPMENT CHARGES RESERVE FUNDS50 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| General Government | Development Charges Cash Collected | slc.61B.L0205.C01.02 | 16,443 | |
| General Government | Interest and Investment Income Earned | slc.61B.L0205.C01.03 | 346 | |
| General Government | Net Development Charges Cash Collected | slc.61B.L0205.C01.06 | 16,789 | |
| General Government | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0205.C01.26 | 5,423 | |
| General Government | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0205.C01.27 | 22,212 | |
| General Government | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0205.C01.28 | 22,212 | |
| General Government | Not listed | slc.61B.L0205.C99.26 | 5,423 | |
| Fire Protection Services | Development Charges Cash Collected | slc.61B.L0210.C01.02 | 46,608 | |
| Fire Protection Services | Interest and Investment Income Earned | slc.61B.L0210.C01.03 | 981 | |
| Fire Protection Services | Net Development Charges Cash Collected | slc.61B.L0210.C01.06 | 47,589 | |
| Fire Protection Services | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0210.C01.26 | 69,714 | |
| Fire Protection Services | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0210.C01.27 | 117,303 | |
| Fire Protection Services | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0210.C01.28 | 117,303 | |
| Fire Protection Services | Not listed | slc.61B.L0210.C99.26 | 69,714 | |
| Highways (Roads and Structures) | Development Charges Cash Collected | slc.61B.L0220.C01.02 | 129,873 | |
| Highways (Roads and Structures) | Interest and Investment Income Earned | slc.61B.L0220.C01.03 | 2,734 | |
| Highways (Roads and Structures) | Net Development Charges Cash Collected | slc.61B.L0220.C01.06 | 132,607 | |
| Highways (Roads and Structures) | To: Tangible Capital Asset Acquisition | slc.61B.L0220.C01.08 | 245,016 | |
| Highways (Roads and Structures) | Total Development Charges Outflows | slc.61B.L0220.C01.11 | 245,016 | |
| Highways (Roads and Structures) | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0220.C01.26 | -138,969 | |
| Highways (Roads and Structures) | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0220.C01.27 | -6,362 | |
| Highways (Roads and Structures) | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0220.C01.28 | -251,378 | |
| Highways (Roads and Structures) | Not listed | slc.61B.L0220.C99.26 | -138,969 | |
| Library | Development Charges Cash Collected | slc.61B.L0275.C01.02 | 6,398 | |
| Library | Interest and Investment Income Earned | slc.61B.L0275.C01.03 | 135 | |
| Library | Net Development Charges Cash Collected | slc.61B.L0275.C01.06 | 6,533 | |
| Library | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0275.C01.26 | 19,022 | |
| Library | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0275.C01.27 | 25,555 | |
| Library | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0275.C01.28 | 25,555 | |
| Library | Not listed | slc.61B.L0275.C99.26 | 19,022 | |
| Parks and Recreation Services | Development Charges Cash Collected | slc.61B.L0280.C01.02 | 36,965 | |
| Parks and Recreation Services | Interest and Investment Income Earned | slc.61B.L0280.C01.03 | 778 | |
| Parks and Recreation Services | Net Development Charges Cash Collected | slc.61B.L0280.C01.06 | 37,743 | |
| Parks and Recreation Services | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0280.C01.26 | 41,914 | |
| Parks and Recreation Services | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0280.C01.27 | 79,657 | |
| Parks and Recreation Services | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0280.C01.28 | 79,657 | |
| Parks and Recreation Services | Not listed | slc.61B.L0280.C99.26 | 41,914 | |
| Waste Diversion Services | Development Charges Cash Collected | slc.61B.L0289.C01.02 | 3,678 | |
| Waste Diversion Services | Interest and Investment Income Earned | slc.61B.L0289.C01.03 | 77 | |
| Waste Diversion Services | Net Development Charges Cash Collected | slc.61B.L0289.C01.06 | 3,755 | |
| Waste Diversion Services | Total Opening Development Charges: Cash Collected, Balance, Jan 1 | slc.61B.L0289.C01.26 | 2,896 | |
| Waste Diversion Services | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0289.C01.27 | 6,651 | |
| Waste Diversion Services | Total Ending Dev. Charges Balance (DC Cash Collected) at Dec. 31 | slc.61B.L0289.C01.28 | 6,651 | |
| Waste Diversion Services | Not listed | slc.61B.L0289.C99.26 | 2,896 | |
| Total Development Charges | Development Charges Cash Collected | slc.61B.L0299.C01.02 | 239,965 | |
| Total Development Charges | Interest and Investment Income Earned | slc.61B.L0299.C01.03 | 5,051 | |
| Total Development Charges | Net Development Charges Cash Collected | slc.61B.L0299.C01.06 | 245,016 | |
| Total Development Charges | To: Tangible Capital Asset Acquisition | slc.61B.L0299.C01.08 | 245,016 | |
| Total Development Charges | Total Development Charges Outflows | slc.61B.L0299.C01.11 | 245,016 | |
| Total Development Charges | Total Dev. Chrgs Bef. Outflows Cash Collect. Bal, Dec. 31 | slc.61B.L0299.C01.27 | 245,016 |
CONSOLIDATED STATEMENT OF FINANCIAL POSITION40 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Cash and cash equivalents | Not listed | slc.70X.L0299.C01.01 | $1.2M | |
| Canada | Not listed | slc.70X.L0410.C01.01 | $197,927 | |
| Ontario | Not listed | slc.70X.L0420.C01.01 | $342,285 | |
| Other municipalities | Not listed | slc.70X.L0440.C01.01 | $22,054 | |
| Other receivables | Not listed | slc.70X.L0490.C01.01 | $116,423 | |
| Accounts Receivable Subtotal | Not listed | slc.70X.L0499.C01.01 | $678,689 | |
| Current year's levies | Not listed | slc.70X.L0610.C01.01 | $381,868 | |
| Previous year's levies | Not listed | slc.70X.L0620.C01.01 | $85,267 | |
| Prior year's levies | Not listed | slc.70X.L0630.C01.01 | $121,512 | |
| Penalties and interest | Not listed | slc.70X.L0640.C01.01 | $94,637 | |
| Less: Allowance for uncollectables | Not listed | slc.70X.L0690.C01.01 | $95,000 | |
| Taxes Receivable Subtotal | Not listed | slc.70X.L0699.C01.01 | $588,284 | |
| Trade accounts payable | Not listed | slc.70X.L2270.C01.01 | $547,623 | |
| Accounts Payable Subtotal | Not listed | slc.70X.L2299.C01.01 | $547,623 | |
| Obligatory reserve funds (SLC 60 2099 01) | Not listed | slc.70X.L2410.C01.01 | $148,169 | |
| Other | Not listed | slc.70X.L2490.C01.01 | $78,144 | |
| Deferred Revenue Subtotal | Not listed | slc.70X.L2499.C01.01 | $226,313 | |
| Debt payable to others | Not listed | slc.70X.L2620.C01.01 | $3.3M | |
| Long term liabilities | Not listed | slc.70X.L2699.C01.01 | $3.3M | |
| Accrued vacation pay | Not listed | slc.70X.L2820.C01.01 | $25,816 | |
| Subtotal Post Employment Benefits | Not listed | slc.70X.L2899.C01.01 | $25,816 | |
| Asset Retirement Obligation Liabilities | Not listed | slc.70X.L2920.C01.01 | $1.3M | |
| Libraries | Not listed | slc.70X.L5045.C01.01 | $39,018 | |
| Total Local Boards | Not listed | slc.70X.L5098.C01.01 | $39,018 | |
| Tangible capital assets (SLC 51 9921 11) | Not listed | slc.70X.L6210.C01.01 | $20.6M | |
| Inventories of supplies | Not listed | slc.70X.L6250.C01.01 | $260,270 | |
| Prepaid expenses | Not listed | slc.70X.L6260.C01.01 | $15,309 | |
| Total Non-Financial Assets | Not listed | slc.70X.L6299.C01.01 | $20.9M | |
| Equity in tangible capital assets | Not listed | slc.70X.L6410.C01.01 | $17.3M | |
| Reserves and reserve funds (SLC 60 2099 02 + SLC 60 2099 03) | Not listed | slc.70X.L6420.C01.01 | $1.9M | |
| Unfunded employee benefits | Not listed | slc.70X.L6601.C01.01 | -$25,816 | |
| Unfunded Asset Retirement Obligation Cost | Not listed | slc.70X.L6604.C01.01 | -$1.3M | |
| Total Other | Not listed | slc.70X.L6699.C01.01 | -$1.3M | |
| Total Financial Assets | Not listed | slc.70X.L9930.C01.01 | $2.5M | |
| Total Liabilities | Not listed | slc.70X.L9940.C01.01 | $5.4M | |
| Net Financial Assets / Net Debt (Total Financial Assets LESS Tota | Not listed | slc.70X.L9945.C01.01 | -$3.0M | |
| Total Accumulated Surplus/(Deficit) | Not listed | slc.70X.L9970.C01.01 | $17.9M | |
| Total Analysis Accumulated Surplus/(Deficit) | Not listed | slc.70X.L9971.C01.01 | $17.9M | |
| Accumulated Surplus (Deficit) Before Remeas. Gains (Losses) | Not listed | slc.70X.L9980.C01.01 | $17.9M | |
| Total Accumulated Surplus (Deficit) | Not listed | slc.70X.L9982.C01.01 | $17.9M |
CONTINUITY OF TAXES RECEIVABLE10 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Taxes receivable, beginning of year | Not listed | slc.72A.L0210.C01.09 | $411,545 | |
| PLUS: Tax amounts levied in the year (SLC 26 9199 03) | Not listed | slc.72A.L0220.C01.09 | $9.3M | |
| PLUS: Current Year Penalties and Interest | Not listed | slc.72A.L0225.C01.09 | $105,112 | |
| LESS: Total cash collections (SLC 72 0699 09) | Not listed | slc.72A.L0240.C01.09 | $9.3M | |
| LESS: Tax adjustments before allowances (SLC 72 2899 09) | Not listed | slc.72A.L0250.C01.09 | $6,314 | |
| Taxes Receivable | Not listed | slc.72A.L0290.C01.09 | $588,284 | |
| Current year's tax | Not listed | slc.72A.L0610.C01.09 | $9.0M | |
| Previous year's tax | Not listed | slc.72A.L0620.C01.09 | $222,036 | |
| Penalties and interest | Not listed | slc.72A.L0630.C01.09 | $88,682 | |
| Total Cash Collections | Not listed | slc.72A.L0699.C01.09 | $9.3M |
CONTINUITY OF TAXES RECEIVABLE47 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Cancellation, red., refund of taxes, overcharges (Mun. Act 357/358) | English - Public | slc.72B.L1020.C01.01 | $630 | |
| Cancellation, red., refund of taxes, overcharges (Mun. Act 357/358) | TOTAL Education | slc.72B.L1020.C01.06 | $630 | |
| Cancellation, red., refund of taxes, overcharges (Mun. Act 357/358) | Lower-Tier (Single-Tier) | slc.72B.L1020.C01.07 | $1,434 | |
| Cancellation, red., refund of taxes, overcharges (Mun. Act 357/358) | Upper-Tier | slc.72B.L1020.C01.08 | $1,638 | |
| Cancellation, red., refund of taxes, overcharges (Mun. Act 357/358) | TOTAL Tax Adjustment | slc.72B.L1020.C01.09 | $3,702 | |
| RfR (Assessment Act 39.1) | English - Public | slc.72B.L1050.C01.01 | $15 | |
| RfR (Assessment Act 39.1) | TOTAL Education | slc.72B.L1050.C01.06 | $15 | |
| RfR (Assessment Act 39.1) | Lower-Tier (Single-Tier) | slc.72B.L1050.C01.07 | $48 | |
| RfR (Assessment Act 39.1) | Upper-Tier | slc.72B.L1050.C01.08 | $41 | |
| RfR (Assessment Act 39.1) | TOTAL Tax Adjustment | slc.72B.L1050.C01.09 | $104 | |
| Post Roll Amended Notice (PRAN) (Assessment Act S32) | English - Public | slc.72B.L1070.C01.01 | $239 | |
| Post Roll Amended Notice (PRAN) (Assessment Act S32) | TOTAL Education | slc.72B.L1070.C01.06 | $239 | |
| Post Roll Amended Notice (PRAN) (Assessment Act S32) | Lower-Tier (Single-Tier) | slc.72B.L1070.C01.07 | $753 | |
| Post Roll Amended Notice (PRAN) (Assessment Act S32) | Upper-Tier | slc.72B.L1070.C01.08 | $643 | |
| Post Roll Amended Notice (PRAN) (Assessment Act S32) | TOTAL Tax Adjustment | slc.72B.L1070.C01.09 | $1,635 | |
| Special Amended Notice (SAN) (Assessment Act) | English - Public | slc.72B.L1080.C01.01 | $211 | |
| Special Amended Notice (SAN) (Assessment Act) | French - Public | slc.72B.L1080.C01.02 | $7 | |
| Special Amended Notice (SAN) (Assessment Act) | English - Separate | slc.72B.L1080.C01.03 | $113 | |
| Special Amended Notice (SAN) (Assessment Act) | French - Separate | slc.72B.L1080.C01.04 | $17 | |
| Special Amended Notice (SAN) (Assessment Act) | TOTAL Education | slc.72B.L1080.C01.06 | $348 | |
| Special Amended Notice (SAN) (Assessment Act) | TOTAL Tax Adjustment | slc.72B.L1080.C01.09 | $348 | |
| Tax Incentive Adjustment (TIA) (Assessment Act) | English - Public | slc.72B.L1090.C01.01 | $77 | |
| Tax Incentive Adjustment (TIA) (Assessment Act) | TOTAL Education | slc.72B.L1090.C01.06 | $77 | |
| Tax Incentive Adjustment (TIA) (Assessment Act) | Lower-Tier (Single-Tier) | slc.72B.L1090.C01.07 | $241 | |
| Tax Incentive Adjustment (TIA) (Assessment Act) | Upper-Tier | slc.72B.L1090.C01.08 | $207 | |
| Tax Incentive Adjustment (TIA) (Assessment Act) | TOTAL Tax Adjustment | slc.72B.L1090.C01.09 | $525 | |
| Subtotal | English - Public | slc.72B.L1099.C01.01 | $1,172 | |
| Subtotal | French - Public | slc.72B.L1099.C01.02 | $7 | |
| Subtotal | English - Separate | slc.72B.L1099.C01.03 | $113 | |
| Subtotal | French - Separate | slc.72B.L1099.C01.04 | $17 | |
| Subtotal | TOTAL Education | slc.72B.L1099.C01.06 | $1,309 | |
| Subtotal | Lower-Tier (Single-Tier) | slc.72B.L1099.C01.07 | $2,476 | |
| Subtotal | Upper-Tier | slc.72B.L1099.C01.08 | $2,529 | |
| Subtotal | TOTAL Tax Adjustment | slc.72B.L1099.C01.09 | $6,314 | |
| Tax Adjustments Before Allowances | English - Public | slc.72B.L2899.C01.01 | $1,172 | |
| Tax Adjustments Before Allowances | French - Public | slc.72B.L2899.C01.02 | $7 | |
| Tax Adjustments Before Allowances | English - Separate | slc.72B.L2899.C01.03 | $113 | |
| Tax Adjustments Before Allowances | French - Separate | slc.72B.L2899.C01.04 | $17 | |
| Tax Adjustments Before Allowances | TOTAL Education | slc.72B.L2899.C01.06 | $1,309 | |
| Tax Adjustments Before Allowances | Lower-Tier (Single-Tier) | slc.72B.L2899.C01.07 | $2,476 | |
| Tax Adjustments Before Allowances | Upper-Tier | slc.72B.L2899.C01.08 | $2,529 | |
| Tax Adjustments Before Allowances | TOTAL Tax Adjustment | slc.72B.L2899.C01.09 | $6,314 | |
| Entitlement of School Boards | English - Public | slc.72B.L7010.C01.01 | $1.2M | |
| Entitlement of School Boards | French - Public | slc.72B.L7010.C01.02 | $8,722 | |
| Entitlement of School Boards | English - Separate | slc.72B.L7010.C01.03 | $188,764 | |
| Entitlement of School Boards | French - Separate | slc.72B.L7010.C01.04 | $17,481 | |
| Entitlement of School Boards | TOTAL Education | slc.72B.L7010.C01.06 | $1.4M |
LONG TERM LIABILITIES AND COMMITMENTS9 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| All outstanding debt issued by the municipality, predecessor muni | Not listed | slc.74A.L0210.C01.01 | $3.3M | |
| All outstanding debt issued by the municipality | Not listed | slc.74A.L0299.C01.01 | $3.3M | |
| Installment (serial) debentures | Not listed | slc.74A.L1220.C01.01 | $3.3M | |
| General government | Not listed | slc.74A.L1405.C01.01 | $35,699 | |
| Protection services | Not listed | slc.74A.L1410.C01.01 | $33,015 | |
| Transportation services : Roadways | Not listed | slc.74A.L1415.C01.01 | $3.3M | |
| 1. TOTAL Net Long Term Liabilities of the Municipality | Not listed | slc.74A.L9910.C01.01 | $3.3M | |
| 2. Debt burden of the municipality: Analysed by debt instrument | Not listed | slc.74A.L9920.C01.01 | $3.3M | |
| 3. Debt burden of the municipality: Analysed by function | Not listed | slc.74A.L9930.C01.01 | $3.3M |
LONG TERM LIABILITIES AND COMMITMENTS4 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Recovered from the consolidated statement of operations : General | Principal | slc.74C.L3012.C03.01 | $501,058 | |
| Recovered from the consolidated statement of operations : General | Interest | slc.74C.L3012.C03.02 | $131,314 | |
| Total | Principal | slc.74C.L3099.C03.01 | $501,058 | |
| Total | Interest | slc.74C.L3099.C03.02 | $131,314 |
LONG TERM LIABILITIES AND COMMITMENTS16 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Year 2025 | Operations Principal | slc.74D.L3210.C01.01 | $471,835 | |
| Year 2025 | Operations Interest | slc.74D.L3210.C01.02 | $124,671 | |
| Year 2026 | Operations Principal | slc.74D.L3220.C01.01 | $436,809 | |
| Year 2026 | Operations Interest | slc.74D.L3220.C01.02 | $114,919 | |
| Year 2027 | Operations Principal | slc.74D.L3230.C01.01 | $436,809 | |
| Year 2027 | Operations Interest | slc.74D.L3230.C01.02 | $97,480 | |
| Year 2028 | Operations Principal | slc.74D.L3240.C01.01 | $436,809 | |
| Year 2028 | Operations Interest | slc.74D.L3240.C01.02 | $80,262 | |
| Year 2029 | Operations Principal | slc.74D.L3250.C01.01 | $381,480 | |
| Year 2029 | Operations Interest | slc.74D.L3250.C01.02 | $62,604 | |
| Years 2030 to 2034 | Operations Principal | slc.74D.L3260.C01.01 | $1.1M | |
| Years 2030 to 2034 | Operations Interest | slc.74D.L3260.C01.02 | $107,721 | |
| Years 2035 onwards | Operations Principal | slc.74D.L3270.C01.01 | $22,674 | |
| Years 2035 onwards | Operations Interest | slc.74D.L3270.C01.02 | $414 | |
| Total | Operations Principal | slc.74D.L3299.C01.01 | $3.3M | |
| Total | Operations Interest | slc.74D.L3299.C01.02 | $588,071 |
LONG TERM LIABILITIES AND COMMITMENTS6 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Environmental Services | Liabilities for ARO at Beginning of Year | slc.74E.L0899.C01.01 | 1,361,375 | |
| Environmental Services | Increase (Decrease) Reflecting Change in the Estimate of Liability | slc.74E.L0899.C01.06 | -64,400 | |
| Environmental Services | Liabilities for ARO at End of Year | slc.74E.L0899.C01.07 | 1,296,975 | |
| Total Asset Retirement Obligations | Liabilities for ARO at Beginning of Year | slc.74E.L9910.C01.01 | 1,361,375 | |
| Total Asset Retirement Obligations | Increase (Decrease) Reflecting Change in the Estimate of Liability | slc.74E.L9910.C01.06 | -64,400 | |
| Total Asset Retirement Obligations | Liabilities for ARO at End of Year | slc.74E.L9910.C01.07 | 1,296,975 |
STATISTICAL INFORMATION32 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Administration | Full-Time Funded Positions | slc.80A.L0205.C01.01 | $8 | |
| Fire | Full-Time Funded Positions | slc.80A.L0210.C01.01 | $1 | |
| Uniform | Full-Time Funded Positions | slc.80A.L0211.C01.01 | $1 | |
| Public Works | Full-Time Funded Positions | slc.80A.L0225.C01.01 | $10 | |
| Public Works | Seasonal Employees | slc.80A.L0225.C01.03 | $2 | |
| Parks and recreation | Full-Time Funded Positions | slc.80A.L0245.C01.01 | $3 | |
| Parks and recreation | Part-Time Funded Positions | slc.80A.L0245.C01.02 | $3 | |
| Parks and recreation | Seasonal Employees | slc.80A.L0245.C01.03 | $1 | |
| Libraries | Part-Time Funded Positions | slc.80A.L0250.C01.02 | $5 | |
| Planning | Full-Time Funded Positions | slc.80A.L0255.C01.01 | $2 | |
| Employees of the Municipality | Full-Time Funded Positions | slc.80A.L0298.C01.01 | $24 | |
| Employees of the Municipality | Part-Time Funded Positions | slc.80A.L0298.C01.02 | $8 | |
| Employees of the Municipality | Seasonal Employees | slc.80A.L0298.C01.03 | $3 | |
| Municipal workforce profile Total | Full-Time Funded Positions | slc.80A.L0399.C01.01 | $24 | |
| Municipal workforce profile Total | Part-Time Funded Positions | slc.80A.L0399.C01.02 | $8 | |
| Municipal workforce profile Total | Seasonal Employees | slc.80A.L0399.C01.03 | $3 | |
| Total construction contracts awarded | Number of Contracts | slc.80A.L1010.C03.01 | $6 | |
| Total construction contracts awarded | Value of Contracts | slc.80A.L1010.C03.02 | $774,949 | |
| Construction contracts awarded at $100,000 or greater | Number of Contracts | slc.80A.L1020.C03.01 | $2 | |
| Construction contracts awarded at $100,000 or greater | Value of Contracts | slc.80A.L1020.C03.02 | $585,388 | |
| Residential properties | Number of Building Permits | slc.80A.L1210.C04.01 | $111 | |
| Residential properties | Total Value of Building Permits | slc.80A.L1210.C04.02 | $20.3M | |
| All other property classes | Number of Building Permits | slc.80A.L1230.C04.01 | $8 | |
| All other property classes | Total Value of Building Permits | slc.80A.L1230.C04.02 | $2.0M | |
| Building permit information Subtotal | Number of Building Permits | slc.80A.L1299.C04.01 | $119 | |
| Building permit information Subtotal | Total Value of Building Permits | slc.80A.L1299.C04.02 | $22.3M | |
| Buildings | Not listed | slc.80A.L1410.C05.01 | $14.2M | |
| Machinery and equipment | Not listed | slc.80A.L1420.C05.01 | $1.5M | |
| Vehicles | Not listed | slc.80A.L1430.C05.01 | $4.5M | |
| Other | Not listed | slc.80A.L1497.C05.01 | $3.0M | |
| Other | Not listed | slc.80A.L1497.C05.0A | Not mapped | Building Content |
| Insured value of physical assets Subtotal | Not listed | slc.80A.L1499.C05.01 | $23.2M |
STATISTICAL INFORMATION16 rows
| Line | Column | SLC | Amount | Text |
|---|---|---|---|---|
| Not listed | Name of Board or Entity | slc.80C.L0851.C01.01 | Not mapped | Township of Greater Madawaska Library Board |
| Not listed | Board Code | slc.80C.L0851.C01.02 | Not mapped | 1604 |
| Not listed | Board Description | slc.80C.L0851.C01.03 | Not mapped | Library Board |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0851.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0852.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0853.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0854.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0855.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0856.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0857.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0858.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0859.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0860.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0861.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0862.C01.04 | 1 | |
| Not listed | Proportion of Total Munic. Contributions Consolidated | slc.80C.L0863.C01.04 | 1 |
Source: Ontario Financial Information Return (FIR) open data. Municipal comparisons should consider tier and type because upper-tier and lower-tier services can overlap.